Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
I-shaped steel beam flexible support hanger node and mounting method
The invention relates to an I-shaped steel beam flexible support hanger node and a mounting method, and relates to the technical field of construction appliances, the node comprises a clamping part, the clamping part is detachably connected with an I-shaped steel flange, the lower end part of the clamping part is connected with a steel cable, and the other end of the steel cable is connected with a pipeline frame. The clamping part is connected with the lower end part of the I-shaped steel, so that the structure of the I-shaped steel cannot be damaged, and when the pipeline frame and a pipeline on the pipeline frame shake horizontally under the conditions of earthquake or other vibration and the like, the steel cable supports the pipeline frame, so that the acting force of the pipeline frame and the pipeline on the pipeline frame in the horizontal direction can be reduced; and therefore, the effect of protecting the pipeline frame and the pipeline on the pipeline frame is achieved.
本申请涉及一种工字钢梁柔性支吊架节点及安装方法,涉及施工用具技术领域,其节点包括夹紧部,所述夹紧部与工字钢翼缘可拆卸连接,夹紧部的下端部连接有钢索,钢索的另一端与管道架相连。将夹紧部与工字钢的下端部相连,不会对工字钢的结构产生破坏,若发生地震或其他震动等情况,管道架和管道架上的管道发生水平晃动时,钢索对管道架进行支撑,可减少管道架和管道架上的管道水平方向的作用力,进而起到保护管道架和管道架上的管道的效果。
I-shaped steel beam flexible support hanger node and mounting method
The invention relates to an I-shaped steel beam flexible support hanger node and a mounting method, and relates to the technical field of construction appliances, the node comprises a clamping part, the clamping part is detachably connected with an I-shaped steel flange, the lower end part of the clamping part is connected with a steel cable, and the other end of the steel cable is connected with a pipeline frame. The clamping part is connected with the lower end part of the I-shaped steel, so that the structure of the I-shaped steel cannot be damaged, and when the pipeline frame and a pipeline on the pipeline frame shake horizontally under the conditions of earthquake or other vibration and the like, the steel cable supports the pipeline frame, so that the acting force of the pipeline frame and the pipeline on the pipeline frame in the horizontal direction can be reduced; and therefore, the effect of protecting the pipeline frame and the pipeline on the pipeline frame is achieved.
本申请涉及一种工字钢梁柔性支吊架节点及安装方法,涉及施工用具技术领域,其节点包括夹紧部,所述夹紧部与工字钢翼缘可拆卸连接,夹紧部的下端部连接有钢索,钢索的另一端与管道架相连。将夹紧部与工字钢的下端部相连,不会对工字钢的结构产生破坏,若发生地震或其他震动等情况,管道架和管道架上的管道发生水平晃动时,钢索对管道架进行支撑,可减少管道架和管道架上的管道水平方向的作用力,进而起到保护管道架和管道架上的管道的效果。
I-shaped steel beam flexible support hanger node and mounting method
一种工字钢梁柔性支吊架节点及安装方法
ZHONG CHONGTING (Autor:in) / ZHANG MINGYOU (Autor:in) / LIANG RUMING (Autor:in) / LIU YANG (Autor:in) / HE XILIANG (Autor:in) / HAN HAILONG (Autor:in) / ZHU RENJIE (Autor:in) / HU WEN (Autor:in) / QIN CHAO (Autor:in) / HE SHIDING (Autor:in)
24.12.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|