Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Road gap filling and repairing process
The invention discloses a road gap filling and repairing process. The process is characterized by comprising the following steps of S1, repairing preparation, S2, cutting and slotting, S3, gap filling and cleaning and S4, filling operation. The step S1 of repairing preparation comprises the following steps that S11, a filling repairing tool and a filling agent are prepared according to the size of the road gap; s12, designing and customizing a standard operation drawing according to the road gap, wherein the standard operation drawing comprises cutting width and length; s13, according to the drawing, cutting lines are drawn near the road gap, and construction is conducted; the step S2 of cutting and grooving comprises the following steps that S21, cutting and grooving are conducted according to standard operation for pavement damage gaps; s22, after cutting and slotting, laying dry stones at the lower part of the slotting, and pouring glue at the upper part of the slotting; the step S3 of crack pouring cleaning comprises the following steps that S31, a crack pouring groove is cleaned through high-pressure hot air of a hot spray gun; according to the technology, it can be guaranteed that enough materials are used for guaranteeing stretching during stretching in winter, moisture and water vapor in a crack pouring groove can be thoroughly removed through high-temperature cleaning, and sufficient combination of crack pouring glue is guaranteed.
本发明公开了一种道路缝隙填充修补工艺,其特征在于:包括以下步骤:S1修补准备、S2切割开槽、S3灌缝清理和S4填补作业;步骤S1修补准备包括以下步骤:S11:根据道路缝隙的尺寸准备填充修补工具和填充剂;S12:根据道路缝隙设计并定制标准作业图纸,包括切割宽度和长度;S13:根据图纸,在道路缝隙附近绘制切割线,进行施工;步骤S2切割开槽包括以下步骤:S21:针对路面破损缝隙,根据标准作业进行切割开槽;S22:切割开槽后,开槽下部铺设干石子,上部进行灌胶;步骤S3灌缝清理包括以下步骤:S31:用热喷枪高压热风清理灌缝槽;该工艺,可以保证冬天拉伸时,有足够的材料保证拉伸,经过高温清理,灌缝槽内可以彻底除去潮气水汽,保证灌缝胶充分结合。
Road gap filling and repairing process
The invention discloses a road gap filling and repairing process. The process is characterized by comprising the following steps of S1, repairing preparation, S2, cutting and slotting, S3, gap filling and cleaning and S4, filling operation. The step S1 of repairing preparation comprises the following steps that S11, a filling repairing tool and a filling agent are prepared according to the size of the road gap; s12, designing and customizing a standard operation drawing according to the road gap, wherein the standard operation drawing comprises cutting width and length; s13, according to the drawing, cutting lines are drawn near the road gap, and construction is conducted; the step S2 of cutting and grooving comprises the following steps that S21, cutting and grooving are conducted according to standard operation for pavement damage gaps; s22, after cutting and slotting, laying dry stones at the lower part of the slotting, and pouring glue at the upper part of the slotting; the step S3 of crack pouring cleaning comprises the following steps that S31, a crack pouring groove is cleaned through high-pressure hot air of a hot spray gun; according to the technology, it can be guaranteed that enough materials are used for guaranteeing stretching during stretching in winter, moisture and water vapor in a crack pouring groove can be thoroughly removed through high-temperature cleaning, and sufficient combination of crack pouring glue is guaranteed.
本发明公开了一种道路缝隙填充修补工艺,其特征在于:包括以下步骤:S1修补准备、S2切割开槽、S3灌缝清理和S4填补作业;步骤S1修补准备包括以下步骤:S11:根据道路缝隙的尺寸准备填充修补工具和填充剂;S12:根据道路缝隙设计并定制标准作业图纸,包括切割宽度和长度;S13:根据图纸,在道路缝隙附近绘制切割线,进行施工;步骤S2切割开槽包括以下步骤:S21:针对路面破损缝隙,根据标准作业进行切割开槽;S22:切割开槽后,开槽下部铺设干石子,上部进行灌胶;步骤S3灌缝清理包括以下步骤:S31:用热喷枪高压热风清理灌缝槽;该工艺,可以保证冬天拉伸时,有足够的材料保证拉伸,经过高温清理,灌缝槽内可以彻底除去潮气水汽,保证灌缝胶充分结合。
Road gap filling and repairing process
一种道路缝隙填充修补工艺
XIAO XIONG (Autor:in) / JIN JIANQIANG (Autor:in) / PAN YONGMING (Autor:in) / JIN WENCHAO (Autor:in) / PU WAN (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Road repairing construction process for filling-digging junction roadbed section
Europäisches Patentamt | 2020
|Asphalt filling head for road maintenance and road repairing device
Europäisches Patentamt | 2022
|Asphalt filling head for road maintenance and road repairing device
Europäisches Patentamt | 2020
|