Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel sheet pile cofferdam and construction method thereof
The invention discloses a steel sheet pile cofferdam and a construction method thereof, and relates to the technical field of cofferdams, the steel sheet pile cofferdam comprises a plurality of steel sheet piles, and every two steel sheet piles are detachably connected; the steel sheet pile comprises a pile body, a plurality of movable parts and a control assembly. A cavity is formed in the pile body; the movable part is movably connected with the pile body; the sliding piece is in sliding connection with the pile body; the driving piece is located in the cavity; after the pile body is inserted into soil, the multiple movable parts move to the limiting position in the direction close to the pile body, the driving part is located at the bottom of the cavity, and the end, away from the driving part, of the sliding part is located above the pile body. The driving part can sequentially drive the multiple movable parts to move in the direction away from the cavity from bottom to top in the upward moving process. The steel sheet piles can be conveniently pulled out of soil, so that the dismantling process of the steel pipe pile cofferdam is more convenient, and the construction efficiency is improved.
本申请公开了一种钢板桩围堰及其施工方法,涉及围堰的技术领域,包括多个钢板桩,且两所述钢板桩之间可拆卸连接;所述钢板桩包括桩体、多个活动件以及控制组件;所述桩体内部具有空腔;所述活动件与所述桩体活动连接;所述滑动件与所述桩体滑动连接;所述驱动件位于所述空腔中;所述桩体插入土壤中后,多个所述活动件均朝靠近所述桩体的方向活动至极限位置,所述驱动件位于所述空腔的底部,所述滑动件远离所述驱动件的一端位于所述桩体的上方;所述驱动件向上活动的过程中能够从下到上依次驱使多个所述活动件朝远离所述空腔的方向活动。本申请能够方便钢板桩从土壤中拔出,从而能够使钢管桩围堰的拆除过程更加方便,提高施工效率。
Steel sheet pile cofferdam and construction method thereof
The invention discloses a steel sheet pile cofferdam and a construction method thereof, and relates to the technical field of cofferdams, the steel sheet pile cofferdam comprises a plurality of steel sheet piles, and every two steel sheet piles are detachably connected; the steel sheet pile comprises a pile body, a plurality of movable parts and a control assembly. A cavity is formed in the pile body; the movable part is movably connected with the pile body; the sliding piece is in sliding connection with the pile body; the driving piece is located in the cavity; after the pile body is inserted into soil, the multiple movable parts move to the limiting position in the direction close to the pile body, the driving part is located at the bottom of the cavity, and the end, away from the driving part, of the sliding part is located above the pile body. The driving part can sequentially drive the multiple movable parts to move in the direction away from the cavity from bottom to top in the upward moving process. The steel sheet piles can be conveniently pulled out of soil, so that the dismantling process of the steel pipe pile cofferdam is more convenient, and the construction efficiency is improved.
本申请公开了一种钢板桩围堰及其施工方法,涉及围堰的技术领域,包括多个钢板桩,且两所述钢板桩之间可拆卸连接;所述钢板桩包括桩体、多个活动件以及控制组件;所述桩体内部具有空腔;所述活动件与所述桩体活动连接;所述滑动件与所述桩体滑动连接;所述驱动件位于所述空腔中;所述桩体插入土壤中后,多个所述活动件均朝靠近所述桩体的方向活动至极限位置,所述驱动件位于所述空腔的底部,所述滑动件远离所述驱动件的一端位于所述桩体的上方;所述驱动件向上活动的过程中能够从下到上依次驱使多个所述活动件朝远离所述空腔的方向活动。本申请能够方便钢板桩从土壤中拔出,从而能够使钢管桩围堰的拆除过程更加方便,提高施工效率。
Steel sheet pile cofferdam and construction method thereof
一种钢板桩围堰及其施工方法
YANG XUEDONG (Autor:in) / LIU TONG (Autor:in) / TAN XIAOLI (Autor:in) / ZHANG PENGCHENG (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel sheet pile cofferdam and construction method thereof
Europäisches Patentamt | 2024
|Steel sheet pile cofferdam and construction method thereof
Europäisches Patentamt | 2020
|