Permanent and temporary combined road pipe penetrating pre-burying construction method and mold
The invention relates to the technical field of road construction, and discloses a permanent and temporary combined road pipe-penetrating pre-burying construction method and mold, and the mold comprises a frame assembly and a supporting assembly. In the application, the side modules and the top module are tightly supported by the upper and lower supports and the left and right supports, and the template system is mounted. The pipeline crossing the road can be pre-buried in advance in the road construction process, can be recycled, and is economical, convenient to operate and high in construction speed. A turnover mold for permanent and temporary combined road pipe penetrating pre-buried construction is used as a template system for penetrating a road pipe network pre-buried pipeline in road construction. The problems that a pipe network drawing and a road drawing are not synchronous and cooperative construction cannot be achieved in construction are solved. And under the condition that the road needs to be constructed in advance and put into use in advance, waste caused by pipe network construction and road breaking and remaking is effectively avoided.
本发明涉及道路施工技术领域,公开了一种永临结合的道路穿管预埋施工方法及模具,包括:框架组件和支撑组件。本申请中,侧模块和顶模块用上下支撑和左右支撑顶紧,模板体系安装完成。可以实现在道路施工过程中对穿越道路的管线进行提前预埋,并可周转使用,经济,操作便捷,施工速度快。使用一种用于永临结合道路穿管预埋施工的可周转模具作为道路施工中穿越道路管网预埋管道的模板体系。解决施工中管网图纸与道路图纸不同步,无法协同施工的难题。在道路需要提前施工,提前投入使用的情况下,有效的避免管网施工,道路需要破除重做造成的浪费。
Permanent and temporary combined road pipe penetrating pre-burying construction method and mold
The invention relates to the technical field of road construction, and discloses a permanent and temporary combined road pipe-penetrating pre-burying construction method and mold, and the mold comprises a frame assembly and a supporting assembly. In the application, the side modules and the top module are tightly supported by the upper and lower supports and the left and right supports, and the template system is mounted. The pipeline crossing the road can be pre-buried in advance in the road construction process, can be recycled, and is economical, convenient to operate and high in construction speed. A turnover mold for permanent and temporary combined road pipe penetrating pre-buried construction is used as a template system for penetrating a road pipe network pre-buried pipeline in road construction. The problems that a pipe network drawing and a road drawing are not synchronous and cooperative construction cannot be achieved in construction are solved. And under the condition that the road needs to be constructed in advance and put into use in advance, waste caused by pipe network construction and road breaking and remaking is effectively avoided.
本发明涉及道路施工技术领域,公开了一种永临结合的道路穿管预埋施工方法及模具,包括:框架组件和支撑组件。本申请中,侧模块和顶模块用上下支撑和左右支撑顶紧,模板体系安装完成。可以实现在道路施工过程中对穿越道路的管线进行提前预埋,并可周转使用,经济,操作便捷,施工速度快。使用一种用于永临结合道路穿管预埋施工的可周转模具作为道路施工中穿越道路管网预埋管道的模板体系。解决施工中管网图纸与道路图纸不同步,无法协同施工的难题。在道路需要提前施工,提前投入使用的情况下,有效的避免管网施工,道路需要破除重做造成的浪费。
Permanent and temporary combined road pipe penetrating pre-burying construction method and mold
一种永临结合的道路穿管预埋施工方法及模具
SHI ZONGLIANG (Autor:in) / CHEN SONG (Autor:in) / QIN KAI (Autor:in) / CHEN WEN (Autor:in) / LI YAOXING (Autor:in) / ZHENG LINGYUAN (Autor:in) / HU HAN (Autor:in) / ZHOU LEI (Autor:in) / LIU LONGSHAN (Autor:in) / WANG BEI (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Urban road construction underground pipe network pre-burying device
Europäisches Patentamt | 2024
|Design and Implementation of Combined Temporary Road and Permanent Road Construction
Trans Tech Publications | 2012
|Design and Implementation of Combined Temporary Road and Permanent Road Construction
British Library Conference Proceedings | 2012
|