Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multifunctional double-row construction method pile supporting structure for waterworks and construction method of multifunctional double-row construction method pile supporting structure
The multifunctional double-row construction method pile supporting structure comprises front-row SMW construction method piles, rear-row SMW construction method piles, top beams and connecting beams, the rear-row SMW construction method piles are arranged on the rear sides of the front-row SMW construction method piles, and the pile tops of the front-row SMW construction method piles and the pile tops of the rear-row SMW construction method piles are connected through the top beams correspondingly; the front-row SMW construction method piles and the rear-row SMW construction method piles are connected through connecting beams, and after building construction is completed and a foundation pit is backfilled, pipelines are laid between the front-row SMW construction method piles and the rear-row SMW construction method piles. According to the multifunctional double-row construction method pile supporting structure for the waterworks, the H-shaped steel in the SMW construction method piles can be repeatedly used and is environmentally friendly and economical, the water stopping effect of an enclosure structure can be effectively improved, the integrality is better, the construction efficiency is improved, and meanwhile waste concrete is reduced; and after building construction is completed, the double-row construction method piles can be reused to serve as a pipeline supporting structure, the economical efficiency is improved, and meanwhile the construction method is more convenient.
本发明涉及一种用于自来水厂的多功能双排工法桩支护结构,包括前排SMW工法桩、后排SMW工法桩、冠梁和连系梁,后排SMW工法桩设置在前排SMW工法桩的后侧,前排SMW工法桩和后排SMW工法桩的桩顶分别由冠梁连接,前排SMW工法桩与后排SMW工法桩之间由连系梁连接,建筑施工完成、基坑回填后,在前排SMW工法桩和后排SMW工法桩之间铺设有管道。本发明的用于自来水厂的多功能双排工法桩支护结构,SMW工法桩中的H型钢可重复利用,绿色经济,能有效提高围护结构的止水效果,整体性更好,提高了施工效率,同时减少废弃混凝土产生;在建筑施工完成后,双排工法桩还可再次利用作为管道支护结构,在提高经济性的同时,施工方法也更便捷。
Multifunctional double-row construction method pile supporting structure for waterworks and construction method of multifunctional double-row construction method pile supporting structure
The multifunctional double-row construction method pile supporting structure comprises front-row SMW construction method piles, rear-row SMW construction method piles, top beams and connecting beams, the rear-row SMW construction method piles are arranged on the rear sides of the front-row SMW construction method piles, and the pile tops of the front-row SMW construction method piles and the pile tops of the rear-row SMW construction method piles are connected through the top beams correspondingly; the front-row SMW construction method piles and the rear-row SMW construction method piles are connected through connecting beams, and after building construction is completed and a foundation pit is backfilled, pipelines are laid between the front-row SMW construction method piles and the rear-row SMW construction method piles. According to the multifunctional double-row construction method pile supporting structure for the waterworks, the H-shaped steel in the SMW construction method piles can be repeatedly used and is environmentally friendly and economical, the water stopping effect of an enclosure structure can be effectively improved, the integrality is better, the construction efficiency is improved, and meanwhile waste concrete is reduced; and after building construction is completed, the double-row construction method piles can be reused to serve as a pipeline supporting structure, the economical efficiency is improved, and meanwhile the construction method is more convenient.
本发明涉及一种用于自来水厂的多功能双排工法桩支护结构,包括前排SMW工法桩、后排SMW工法桩、冠梁和连系梁,后排SMW工法桩设置在前排SMW工法桩的后侧,前排SMW工法桩和后排SMW工法桩的桩顶分别由冠梁连接,前排SMW工法桩与后排SMW工法桩之间由连系梁连接,建筑施工完成、基坑回填后,在前排SMW工法桩和后排SMW工法桩之间铺设有管道。本发明的用于自来水厂的多功能双排工法桩支护结构,SMW工法桩中的H型钢可重复利用,绿色经济,能有效提高围护结构的止水效果,整体性更好,提高了施工效率,同时减少废弃混凝土产生;在建筑施工完成后,双排工法桩还可再次利用作为管道支护结构,在提高经济性的同时,施工方法也更便捷。
Multifunctional double-row construction method pile supporting structure for waterworks and construction method of multifunctional double-row construction method pile supporting structure
一种用于自来水厂的多功能双排工法桩支护结构及其施工方法
ZHOU ZHENHAI (Autor:in) / LI SHENJIE (Autor:in) / ZHENG YANHUA (Autor:in) / ZHANG XILIN (Autor:in) / WANG HAO (Autor:in) / ZHANG YUNMEI (Autor:in) / CAO XINKUN (Autor:in) / ZOU ZHIQIANG (Autor:in) / WANG JIARUI (Autor:in)
31.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Double-row pile foundation pit supporting structure and construction method
Europäisches Patentamt | 2023
|Double-row micro pile foundation pit supporting structure and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|