Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a novel supporting formwork system and an erecting and disassembling method. Main transverse rods and vertical rods of the system are connected through crimping sockets; the early-dismantling assembly comprises an early-dismantling lead screw, an early-dismantling outer sleeve, an early-dismantling inner sleeve, an early-dismantling clamping ring and an adjusting movable supporting plate. The early-dismantling assembly is connected to the top of the vertical rod through an early-dismantling lead screw. The early-dismantling screw rod penetrates through the centers of the early-dismantling outer sleeve and the early-dismantling inner sleeve, the lower end of the early-dismantling inner sleeve is located in the early-dismantling outer sleeve, and an inner sleeve jacking support is formed at the upper end of the early-dismantling inner sleeve; the early-dismantling snap ring is fixed at the joint position of the early-dismantling outer sleeve and the early-dismantling inner sleeve; the adjusting movable supporting plate is screwed to the top end of the early-dismantling lead screw. A supporting pipe is arranged above the inner sleeve jacking, supporting battens are arranged above the supporting pipe, and a supporting formwork is arranged at the upper ends of the supporting battens. And the movable supporting plate is adjusted to be located in the gap of the supporting batten and supports the supporting formwork. The steel, wood and formwork supporting system can be quickly and conveniently dismantled as much as possible, and the turnover use efficiency of steel, wood and formworks is improved.
一种新型支撑模架体系及搭拆方法,该体系主横杆和立杆通过压接插座连接;早拆组件包括早拆丝杆、早拆外套、早拆内套、早拆卡环和调节活动支撑板;早拆组件通过早拆丝杆连接在立杆的顶部;早拆丝杆从早拆外套和早拆内套的中心穿过,早拆内套的下端处于早拆外套的内部,早拆内套的上端形成有内套顶托;早拆卡环固定在早拆外套和早拆内套的接口位置;调节活动支撑板旋接在早拆丝杆的顶端;内套顶托的上方设置有支撑管,支撑管的上方排布有支撑木方,支撑木方的上端设有支撑模板;调节活动支撑板处于支撑木方的间隙中并对支撑模板进行支撑。本发明能够快速方便的拆除尽可能多钢材、木材和模板的支撑体系,提高钢材、木材和模板的周转使用效率。
The invention discloses a novel supporting formwork system and an erecting and disassembling method. Main transverse rods and vertical rods of the system are connected through crimping sockets; the early-dismantling assembly comprises an early-dismantling lead screw, an early-dismantling outer sleeve, an early-dismantling inner sleeve, an early-dismantling clamping ring and an adjusting movable supporting plate. The early-dismantling assembly is connected to the top of the vertical rod through an early-dismantling lead screw. The early-dismantling screw rod penetrates through the centers of the early-dismantling outer sleeve and the early-dismantling inner sleeve, the lower end of the early-dismantling inner sleeve is located in the early-dismantling outer sleeve, and an inner sleeve jacking support is formed at the upper end of the early-dismantling inner sleeve; the early-dismantling snap ring is fixed at the joint position of the early-dismantling outer sleeve and the early-dismantling inner sleeve; the adjusting movable supporting plate is screwed to the top end of the early-dismantling lead screw. A supporting pipe is arranged above the inner sleeve jacking, supporting battens are arranged above the supporting pipe, and a supporting formwork is arranged at the upper ends of the supporting battens. And the movable supporting plate is adjusted to be located in the gap of the supporting batten and supports the supporting formwork. The steel, wood and formwork supporting system can be quickly and conveniently dismantled as much as possible, and the turnover use efficiency of steel, wood and formworks is improved.
一种新型支撑模架体系及搭拆方法,该体系主横杆和立杆通过压接插座连接;早拆组件包括早拆丝杆、早拆外套、早拆内套、早拆卡环和调节活动支撑板;早拆组件通过早拆丝杆连接在立杆的顶部;早拆丝杆从早拆外套和早拆内套的中心穿过,早拆内套的下端处于早拆外套的内部,早拆内套的上端形成有内套顶托;早拆卡环固定在早拆外套和早拆内套的接口位置;调节活动支撑板旋接在早拆丝杆的顶端;内套顶托的上方设置有支撑管,支撑管的上方排布有支撑木方,支撑木方的上端设有支撑模板;调节活动支撑板处于支撑木方的间隙中并对支撑模板进行支撑。本发明能够快速方便的拆除尽可能多钢材、木材和模板的支撑体系,提高钢材、木材和模板的周转使用效率。
Novel supporting formwork system and erecting and disassembling method
一种新型支撑模架体系及搭拆方法
31.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Erecting method for bridge padstone rapid supporting and disassembling formwork
Europäisches Patentamt | 2022
|Formwork supporting system and erecting method of formwork supporting system
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Formwork supporting system frame body erecting method
Europäisches Patentamt | 2022
|Building formwork erecting system and formwork erecting method
Europäisches Patentamt | 2023
|