Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel structure integral moving type mounting equipment and method
The invention discloses steel structure integral movable type installation equipment which comprises an integral steel structure frame. The guide rails are arranged on two sides of the platform; the operation platform is arranged below the integral steel structure frame; the operation platform lifting rails are arranged on the two sides of the operation platform; the slope adjusting track, the horizontal moving rod and the steel beam grabbing rod are arranged on the operation platform, a steel beam is grabbed through the steel beam grabbing rod, the inclination degree and the position are adjusted through the slope adjusting track, the horizontal moving rod and the lifting track, and workers are assisted in completing steel beam installation on the operation platform. According to the equipment, the functions of efficient grabbing of the steel beam, slope adjustment, accurate control over the horizontal position and the like are achieved, the installation efficiency is effectively improved, the working intensity of operators is reduced, dependence on hoisting machinery is reduced, the construction safety is remarkably improved, the equipment can adapt to various construction conditions, and the construction cost is reduced. And a more convenient and safer solution is provided for steel structure installation.
本发明公开了钢结构整体移动式安装设备,包括:整体钢结构框架;设于平台两侧的导轨;设于所述整体钢结构框架下方的操作平台;设于所述操作平台两侧的操作平台升降轨道;以及设于所述操作平台上的坡度调节轨道、水平移动杆和钢梁抓取杆,通过所述钢梁抓取杆抓取钢梁,通过所述坡度调节轨道、所述水平移动杆以及所述升降轨道调节倾斜度度和位置,辅助工作人员在所述操作平台上完成钢梁安装。该设备实现了钢梁的高效抓取、调整坡度以及水平位置的精确控制等功能,不仅有效提高了安装效率,降低了作业人员的工作强度,减少了对吊装机械的依赖,并显著提升了施工安全性,还能够适应多种施工条件,为钢结构安装提供了更为便捷、安全的解决方案。
Steel structure integral moving type mounting equipment and method
The invention discloses steel structure integral movable type installation equipment which comprises an integral steel structure frame. The guide rails are arranged on two sides of the platform; the operation platform is arranged below the integral steel structure frame; the operation platform lifting rails are arranged on the two sides of the operation platform; the slope adjusting track, the horizontal moving rod and the steel beam grabbing rod are arranged on the operation platform, a steel beam is grabbed through the steel beam grabbing rod, the inclination degree and the position are adjusted through the slope adjusting track, the horizontal moving rod and the lifting track, and workers are assisted in completing steel beam installation on the operation platform. According to the equipment, the functions of efficient grabbing of the steel beam, slope adjustment, accurate control over the horizontal position and the like are achieved, the installation efficiency is effectively improved, the working intensity of operators is reduced, dependence on hoisting machinery is reduced, the construction safety is remarkably improved, the equipment can adapt to various construction conditions, and the construction cost is reduced. And a more convenient and safer solution is provided for steel structure installation.
本发明公开了钢结构整体移动式安装设备,包括:整体钢结构框架;设于平台两侧的导轨;设于所述整体钢结构框架下方的操作平台;设于所述操作平台两侧的操作平台升降轨道;以及设于所述操作平台上的坡度调节轨道、水平移动杆和钢梁抓取杆,通过所述钢梁抓取杆抓取钢梁,通过所述坡度调节轨道、所述水平移动杆以及所述升降轨道调节倾斜度度和位置,辅助工作人员在所述操作平台上完成钢梁安装。该设备实现了钢梁的高效抓取、调整坡度以及水平位置的精确控制等功能,不仅有效提高了安装效率,降低了作业人员的工作强度,减少了对吊装机械的依赖,并显著提升了施工安全性,还能够适应多种施工条件,为钢结构安装提供了更为便捷、安全的解决方案。
Steel structure integral moving type mounting equipment and method
钢结构整体移动式安装设备及方法
ZHANG JINHUA (Autor:in) / SUN HAOMING (Autor:in) / MENG XIWEI (Autor:in) / HUANG ZE (Autor:in)
31.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel structure truss mounting construction equipment and mounting construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|