Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flexible dike breach structure
The invention belongs to the technical field of dike engineering, and particularly relates to a flexible dike breach structure which comprises a base. The dike body is fixedly connected to the top of the base; the fixed seat is fixedly connected to the front end of the base; the multiple fixing plates are fixedly connected to the rear end of the base and fixedly connected to the side wall of the dike body; through cooperation of a first connecting block, a second connecting block and a connecting rod, the safety threshold value of the bearing capacity of the dike body is set in a computer program, when the water level of river water exceeds the safety bearing capacity of the dike body, an electric push rod is controlled through the computer program, and a moving plate is pushed through the output end of the electric push rod; the moving plate moves to drive the second connecting block to move, the second connecting block drives the connecting rod to move, the bottom end of the connecting rod rotates to drive the first connecting block to move downwards, at the moment, the connecting rod rotates to be in an inclined state, supporting of the dike body is achieved, the supporting time of the dike body is prolonged, and rescue time is provided for rescue workers.
本发明属于堤防工程技术领域,具体地说是一种柔性堤防溃口结构,包括:底座;堤防本体,固接在底座的顶部;固定座,固接在底座的前端;多个固定板,均固接在底座的后端,且固接在堤防本体的侧壁上;通过第一连接块、第二连接块和连接杆的配合,在电脑程序内设定堤防本体的承载能力的安全阈值,当河水的水位超过堤防本体的安全承载能力时,通过电脑程序控制电动推杆,通过电动推杆的输出端推动移动板,移动板运动带动第二连接块运动,通过第二连接块带动连接杆运动,连接杆的底端发生转动时带动第一连接块向下运动,此时连接杆转动为倾斜状态,实现对堤防本体的支撑,延长堤防本体的支撑时间,为救援人员提供救援时间。
Flexible dike breach structure
The invention belongs to the technical field of dike engineering, and particularly relates to a flexible dike breach structure which comprises a base. The dike body is fixedly connected to the top of the base; the fixed seat is fixedly connected to the front end of the base; the multiple fixing plates are fixedly connected to the rear end of the base and fixedly connected to the side wall of the dike body; through cooperation of a first connecting block, a second connecting block and a connecting rod, the safety threshold value of the bearing capacity of the dike body is set in a computer program, when the water level of river water exceeds the safety bearing capacity of the dike body, an electric push rod is controlled through the computer program, and a moving plate is pushed through the output end of the electric push rod; the moving plate moves to drive the second connecting block to move, the second connecting block drives the connecting rod to move, the bottom end of the connecting rod rotates to drive the first connecting block to move downwards, at the moment, the connecting rod rotates to be in an inclined state, supporting of the dike body is achieved, the supporting time of the dike body is prolonged, and rescue time is provided for rescue workers.
本发明属于堤防工程技术领域,具体地说是一种柔性堤防溃口结构,包括:底座;堤防本体,固接在底座的顶部;固定座,固接在底座的前端;多个固定板,均固接在底座的后端,且固接在堤防本体的侧壁上;通过第一连接块、第二连接块和连接杆的配合,在电脑程序内设定堤防本体的承载能力的安全阈值,当河水的水位超过堤防本体的安全承载能力时,通过电脑程序控制电动推杆,通过电动推杆的输出端推动移动板,移动板运动带动第二连接块运动,通过第二连接块带动连接杆运动,连接杆的底端发生转动时带动第一连接块向下运动,此时连接杆转动为倾斜状态,实现对堤防本体的支撑,延长堤防本体的支撑时间,为救援人员提供救援时间。
Flexible dike breach structure
一种柔性堤防溃口结构
WANG HONGQI (Autor:in) / ZOU YI (Autor:in)
03.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Dike breach flexible plugging facility and plugging method
Europäisches Patentamt | 2024
|