Building engineering pile foundation construction method
The invention relates to the technical field of building construction, in particular to a building engineering pile foundation construction method which comprises the following steps: S1, measurement preparation; s2, plane control; s3, elevation control; s4, pile casing burying; s5, slurry treatment; s6, rotary digging and hole forming; s7, hole cleaning; s8, a reinforcement cage is manufactured and hoisted; and S9, underwater concrete pouring is conducted. According to the method, the requirements of an owner on engineering quality, progress, safety, environmental protection and the like in a bid invitation file can be met; and advanced construction technology and construction equipment are adopted, key parts are emphatically controlled, and the engineering construction quality and speed are guaranteed.
本发明涉及建筑施工技术领域,具体为一种建筑工程桩基施工方法,包括如下步骤:S1:测量准备;S2:平面控制;S3:高程控制;S4:护筒埋设;S5:泥浆处理;S6:旋挖成孔;S7:清孔;S8:钢筋笼的制作和吊放;S9:水下混凝土灌注。本发明能够满足业主在招标文件中对工程质量、进度、安全、环境保护等各方面的要求;并且采用先进施工技术和施工设备,对关键部位重点控制,保证工程施工质量与速度。
Building engineering pile foundation construction method
The invention relates to the technical field of building construction, in particular to a building engineering pile foundation construction method which comprises the following steps: S1, measurement preparation; s2, plane control; s3, elevation control; s4, pile casing burying; s5, slurry treatment; s6, rotary digging and hole forming; s7, hole cleaning; s8, a reinforcement cage is manufactured and hoisted; and S9, underwater concrete pouring is conducted. According to the method, the requirements of an owner on engineering quality, progress, safety, environmental protection and the like in a bid invitation file can be met; and advanced construction technology and construction equipment are adopted, key parts are emphatically controlled, and the engineering construction quality and speed are guaranteed.
本发明涉及建筑施工技术领域,具体为一种建筑工程桩基施工方法,包括如下步骤:S1:测量准备;S2:平面控制;S3:高程控制;S4:护筒埋设;S5:泥浆处理;S6:旋挖成孔;S7:清孔;S8:钢筋笼的制作和吊放;S9:水下混凝土灌注。本发明能够满足业主在招标文件中对工程质量、进度、安全、环境保护等各方面的要求;并且采用先进施工技术和施工设备,对关键部位重点控制,保证工程施工质量与速度。
Building engineering pile foundation construction method
一种建筑工程桩基施工方法
JIANG XUEJUN (Autor:in) / LIN WEIZHEN (Autor:in) / CHENG YI (Autor:in) / YANG BAISHUN (Autor:in) / YU CHUANXI (Autor:in) / RUAN XINXIN (Autor:in) / GE BINGLIN (Autor:in)
03.01.2025
Patent
Elektronische Ressource
Chinesisch
Civil engineering building foundation pile construction equipment
Europäisches Patentamt | 2022
|Civil engineering building foundation pile construction equipment
Europäisches Patentamt | 2022
|Civil engineering building foundation pile construction equipment
Europäisches Patentamt | 2022
|Civil engineering building foundation pile construction equipment
Europäisches Patentamt | 2024
|