Fabricated precast pile foundation retaining wall structure and construction method
The invention discloses an assembly type precast pile foundation retaining wall structure and a construction method, and the method comprises the following steps: S100, carrying out site cleaning and leveling work before construction, and arranging temporary facilities including a construction fence and a temporary road; s200, according to a design drawing and specifications, the distance between the hollow square piles is controlled according to the width of the retaining wall plate, and the hollow square piles are constructed; s300, earth excavation is conducted after the installation area of the retaining wall plate is determined, the retaining wall plate is installed in the installation area, and the joint of the retaining wall plate and the installation area is connected with the prestressed concrete hollow square pile through connecting mortar; s400, a circular cavity of the hollow square pile is filled with core filling materials so as to block the hollow square pile, holes of the retaining wall plate are filled with extruded sheet fragments for blocking, and the retaining wall plate and the top beam are connected through anchoring steel bars; s500, after construction of the main body structure is completed, functional tests including a hydraulic test are carried out to determine that the stability and the safety of the structure meet the requirements; and S600, backfilling operation is conducted according to the design scheme.
本发明公开了一种装配式预制桩基挡土墙结构及施工方法,方法包括:S100、进行施工前的场地清理和平整工作、设置包括施工围栏、临时道路在内的临时设施;S200、根据设计图纸及规范,根据挡墙板的宽度控制空心方桩之间的距离,对空心方桩进行施工;S300、确定挡墙板的安装区域后进行土方开挖,将挡墙板安装至该安装区域中,二者连接处通过连接砂浆与预应力混凝土空心方桩相连;S400、于空心方桩的圆形空腔内填充填芯物以对其进行封堵,于挡墙板的孔中填充挤塑板碎块进行封堵,并以锚固钢筋将挡墙板和冠梁进行连接;S500、完成主体结构施工后,进行包括水压试验在内的功能性测试,以确定结构的稳定性和安全性满足要求;S600、按照设计方案进行回填作业。
Fabricated precast pile foundation retaining wall structure and construction method
The invention discloses an assembly type precast pile foundation retaining wall structure and a construction method, and the method comprises the following steps: S100, carrying out site cleaning and leveling work before construction, and arranging temporary facilities including a construction fence and a temporary road; s200, according to a design drawing and specifications, the distance between the hollow square piles is controlled according to the width of the retaining wall plate, and the hollow square piles are constructed; s300, earth excavation is conducted after the installation area of the retaining wall plate is determined, the retaining wall plate is installed in the installation area, and the joint of the retaining wall plate and the installation area is connected with the prestressed concrete hollow square pile through connecting mortar; s400, a circular cavity of the hollow square pile is filled with core filling materials so as to block the hollow square pile, holes of the retaining wall plate are filled with extruded sheet fragments for blocking, and the retaining wall plate and the top beam are connected through anchoring steel bars; s500, after construction of the main body structure is completed, functional tests including a hydraulic test are carried out to determine that the stability and the safety of the structure meet the requirements; and S600, backfilling operation is conducted according to the design scheme.
本发明公开了一种装配式预制桩基挡土墙结构及施工方法,方法包括:S100、进行施工前的场地清理和平整工作、设置包括施工围栏、临时道路在内的临时设施;S200、根据设计图纸及规范,根据挡墙板的宽度控制空心方桩之间的距离,对空心方桩进行施工;S300、确定挡墙板的安装区域后进行土方开挖,将挡墙板安装至该安装区域中,二者连接处通过连接砂浆与预应力混凝土空心方桩相连;S400、于空心方桩的圆形空腔内填充填芯物以对其进行封堵,于挡墙板的孔中填充挤塑板碎块进行封堵,并以锚固钢筋将挡墙板和冠梁进行连接;S500、完成主体结构施工后,进行包括水压试验在内的功能性测试,以确定结构的稳定性和安全性满足要求;S600、按照设计方案进行回填作业。
Fabricated precast pile foundation retaining wall structure and construction method
装配式预制桩基挡土墙结构及施工方法
ZHOU WEIWEI (Autor:in) / DENG JIAN (Autor:in) / FENG JIANQIAO (Autor:in) / QIU KUI (Autor:in) / CHEN LINKANG (Autor:in)
03.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Fabricated precast concrete retaining wall and construction method
Europäisches Patentamt | 2021
|Retaining wall construction methods using precast concrete pile
Europäisches Patentamt | 2022
|Pile foundation retaining wall structure and construction method
Europäisches Patentamt | 2020
|Construction method of precast pile foundation and precast pile foundation
Europäisches Patentamt | 2024
|A Retaining wall using Precast pile and Construction method thereof
Europäisches Patentamt | 2017
|