Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention discloses a building construction scaffold, and relates to the technical field of scaffolds.The building construction scaffold comprises two portal frames aligned with each other, grooves are formed in the tops of the portal frames, moving mechanisms are arranged at the bottoms of the two portal frames, and the portal frames move through the moving mechanisms; two equidistant unfolding assemblies are jointly arranged between the two portal frames, the distance between the two portal frames is adjusted through the two equidistant unfolding assemblies, the two equidistant unfolding assemblies are arranged at the two ends of the top of the portal frames respectively, and a ladder stand is fixed to the outer side of one portal frame. The distance between the two portal frames is adjusted through the two equidistant unfolding assemblies, namely, the distance between the grooves in the tops of the two portal frames is adjusted, so that supporting plates with different lengths can be placed, replacement is carried out relative to a workbench, the replacement mode is more convenient and faster, and the construction efficiency is improved.
本发明公开了一种建筑施工脚手架,涉及脚手架技术领域,包括两个龙门正对齐的龙门架,所述龙门架的顶部开设凹槽,两个所述龙门架的底部均设置有移动机构,龙门架通过移动机构进行移动,两个所述龙门架之间共同设置两个等距离展开组件,且两个龙门架通过两个等距离展开组件进行距离调节,两个等距离展开组件分别设置在龙门架的龙门顶部两端位置处,其中一个所述龙门架的外侧固定有爬梯。本发明的两个龙门架通过两个等距离展开组件进行距离调节,即调节两个龙门架顶部凹槽之间的距离,从而能够放置不同长度的支撑板,相对于工作台置换,此种更换方式更加方便以及快捷,提高了施工效率。
The invention discloses a building construction scaffold, and relates to the technical field of scaffolds.The building construction scaffold comprises two portal frames aligned with each other, grooves are formed in the tops of the portal frames, moving mechanisms are arranged at the bottoms of the two portal frames, and the portal frames move through the moving mechanisms; two equidistant unfolding assemblies are jointly arranged between the two portal frames, the distance between the two portal frames is adjusted through the two equidistant unfolding assemblies, the two equidistant unfolding assemblies are arranged at the two ends of the top of the portal frames respectively, and a ladder stand is fixed to the outer side of one portal frame. The distance between the two portal frames is adjusted through the two equidistant unfolding assemblies, namely, the distance between the grooves in the tops of the two portal frames is adjusted, so that supporting plates with different lengths can be placed, replacement is carried out relative to a workbench, the replacement mode is more convenient and faster, and the construction efficiency is improved.
本发明公开了一种建筑施工脚手架,涉及脚手架技术领域,包括两个龙门正对齐的龙门架,所述龙门架的顶部开设凹槽,两个所述龙门架的底部均设置有移动机构,龙门架通过移动机构进行移动,两个所述龙门架之间共同设置两个等距离展开组件,且两个龙门架通过两个等距离展开组件进行距离调节,两个等距离展开组件分别设置在龙门架的龙门顶部两端位置处,其中一个所述龙门架的外侧固定有爬梯。本发明的两个龙门架通过两个等距离展开组件进行距离调节,即调节两个龙门架顶部凹槽之间的距离,从而能够放置不同长度的支撑板,相对于工作台置换,此种更换方式更加方便以及快捷,提高了施工效率。
Building construction scaffold
一种建筑施工脚手架
ZHANG HENG (Autor:in)
03.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Scaffold for building construction and building construction method applying scaffold
Europäisches Patentamt | 2021
|