Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Overground artificial canal and construction method thereof
An overground artificial canal comprises a main channel, auxiliary channels and artificial dams, the auxiliary channels are arranged on the two sides of the main channel, the artificial dams are arranged on the peripheries of the auxiliary channels, the artificial canal is excavated on the basis of the original ground, the main channel is formed through ground excavation, riverbeds of the auxiliary channels are the original ground, and the artificial dams are arranged on the original ground. And a certain gap is formed between the artificial dam and the main channel, so that an auxiliary channel is formed on the original ground between the artificial dam and the main channel, and the artificial canal forms a ten-thousand-ton round channel of which the water surface is always higher than the original ground.
一种地上人工运河,包括:主航道、副航道和人工堤坝,副航道布设在主航道的两侧,人工堤坝布设在副航道的外围,本人工运河在原始地面的基础上进行开挖,主航道通过地面开挖形成,副航道的河床为原始地面,人工堤坝布设在原始地面上,并且人工堤坝与主航道之间设有一定的间隙,从而在人工堤坝、主航道之间的原始地面上形成副航道,使人工运河形成水面始终高于原始地面的万吨轮航道。
Overground artificial canal and construction method thereof
An overground artificial canal comprises a main channel, auxiliary channels and artificial dams, the auxiliary channels are arranged on the two sides of the main channel, the artificial dams are arranged on the peripheries of the auxiliary channels, the artificial canal is excavated on the basis of the original ground, the main channel is formed through ground excavation, riverbeds of the auxiliary channels are the original ground, and the artificial dams are arranged on the original ground. And a certain gap is formed between the artificial dam and the main channel, so that an auxiliary channel is formed on the original ground between the artificial dam and the main channel, and the artificial canal forms a ten-thousand-ton round channel of which the water surface is always higher than the original ground.
一种地上人工运河,包括:主航道、副航道和人工堤坝,副航道布设在主航道的两侧,人工堤坝布设在副航道的外围,本人工运河在原始地面的基础上进行开挖,主航道通过地面开挖形成,副航道的河床为原始地面,人工堤坝布设在原始地面上,并且人工堤坝与主航道之间设有一定的间隙,从而在人工堤坝、主航道之间的原始地面上形成副航道,使人工运河形成水面始终高于原始地面的万吨轮航道。
Overground artificial canal and construction method thereof
一种地上人工运河及其施工方法
HU DEMING (Autor:in) / ZHAO KAN (Autor:in) / HU JIAJING (Autor:in)
14.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Combined traffic organization for overground structure construction and construction method thereof
Europäisches Patentamt | 2023
|Overground outer wall anti-seepage structure and construction method
Europäisches Patentamt | 2023
|Construction method for additionally constructing overground parking garage
Europäisches Patentamt | 2021
|Online Contents | 1997
IuD Bahn | 2012
|