Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of assembly buildings, in particular to a steel-concrete column for building assembly and an assembly building, the steel-concrete column assembly building comprises a cross beam plate, a building box fixed to the end of the cross beam plate and a plurality of centralized controllers arranged in the building box, and each centralized controller comprises a bending control shaft and a clamping control shaft; the row of assembling units are in transmission connection between the bending control shaft and the clamping control shaft, in the initial building stage of the steel-concrete column body and the assembled building, the bending control shaft is rotated to conduct centralized control on the row of assembling units, then the top ends of the row of erecting steel bars are controlled to be bent synchronously, and therefore the steel-concrete column body and the assembled building can be rapidly connected; after the assembly building is put into use, if distortion and deviation of connection between the reinforced concrete column and the assembly building are caused by accidental impact, the assembly units can be controlled by rotating the bending control shaft and the clamping control shaft, a row of erecting steel bars are corrected and pulled, and all the erecting steel bars are corrected and pulled to be in an initial normal bending state.
本发明涉及装配建筑技术领域,具体为一种建筑装配用钢混柱体及装配建筑,钢混柱体装配建筑包括有横梁板、横梁板端部固定的建筑盒,以及建筑盒中设置的多个集控器,集控器包括有弯控轴和夹控轴,以及在弯控轴、夹控轴之间传动连接的一排装配单元,在钢混柱体和装配建筑初始搭建阶段,通过转动弯控轴来对一排装配单元进行集中控制,进而控制一排架立钢筋顶端同步弯曲,这样钢混柱体和装配建筑可以快速连接,而装配建筑投入使用后,如果意外冲击造成钢混柱体和装配建筑之间连接的扭曲偏移,可以通过转动弯控轴和夹控轴来控制装配单元,对一排架立钢筋进行纠正拉扯,使所有的架立钢筋被纠正拉扯为初始正常弯曲状态。
The invention relates to the technical field of assembly buildings, in particular to a steel-concrete column for building assembly and an assembly building, the steel-concrete column assembly building comprises a cross beam plate, a building box fixed to the end of the cross beam plate and a plurality of centralized controllers arranged in the building box, and each centralized controller comprises a bending control shaft and a clamping control shaft; the row of assembling units are in transmission connection between the bending control shaft and the clamping control shaft, in the initial building stage of the steel-concrete column body and the assembled building, the bending control shaft is rotated to conduct centralized control on the row of assembling units, then the top ends of the row of erecting steel bars are controlled to be bent synchronously, and therefore the steel-concrete column body and the assembled building can be rapidly connected; after the assembly building is put into use, if distortion and deviation of connection between the reinforced concrete column and the assembly building are caused by accidental impact, the assembly units can be controlled by rotating the bending control shaft and the clamping control shaft, a row of erecting steel bars are corrected and pulled, and all the erecting steel bars are corrected and pulled to be in an initial normal bending state.
本发明涉及装配建筑技术领域,具体为一种建筑装配用钢混柱体及装配建筑,钢混柱体装配建筑包括有横梁板、横梁板端部固定的建筑盒,以及建筑盒中设置的多个集控器,集控器包括有弯控轴和夹控轴,以及在弯控轴、夹控轴之间传动连接的一排装配单元,在钢混柱体和装配建筑初始搭建阶段,通过转动弯控轴来对一排装配单元进行集中控制,进而控制一排架立钢筋顶端同步弯曲,这样钢混柱体和装配建筑可以快速连接,而装配建筑投入使用后,如果意外冲击造成钢混柱体和装配建筑之间连接的扭曲偏移,可以通过转动弯控轴和夹控轴来控制装配单元,对一排架立钢筋进行纠正拉扯,使所有的架立钢筋被纠正拉扯为初始正常弯曲状态。
Steel-concrete column body for building assembly and assembled building
一种建筑装配用钢混柱体及装配建筑
WANG JIAN (Autor:in)
21.01.2025
Patent
Elektronische Ressource
Chinesisch
Concrete-filled steel tube column body of building and building method thereof
Europäisches Patentamt | 2015
|Assembled building concrete prefabricated column positioning guiding frame
Europäisches Patentamt | 2020
|Pre-fabricated column concrete pouring method in assembled building
Europäisches Patentamt | 2020
|CONCRETE COLUMN BODY, ASSEMBLED CONCRETE COLUMN, AND CONCRETE COLUMN BODY MANUFACTURING METHOD
Europäisches Patentamt | 2022
|