The invention discloses a bridge cable crane overall installation method which comprises the following steps: acquiring environmental data, and acquiring construction data according to the environmental data; a bridge cable hoisting model is established by combining a BIM building information model technology with a finite element model technology, and a lighting system is added; carrying out installation construction based on the bridge cable hoisting model; environment data and installation data are collected in real time, the construction risk early warning level is obtained, and the bridge cable hoisting model is adjusted in real time; after the bridge is installed, installation data are collected, whether bridge installation is qualified or not is evaluated, installation is adjusted, a bridge flood-fighting shake inversion model, a bridge anti-seismic shake inversion model and a bridge anti-compression shake inversion model are established, and the flood-fighting performance, the anti-seismic performance and the anti-compression performance of the bridge are evaluated; according to the method, the BIM building information model technology and the finite element model technology are fused, field monitoring data can be timely and accurately collected, the bridge construction dynamic state is grasped through online analysis of the data, and the bridge construction safety is ensured.
本发明公开了一种桥梁缆索吊总体安装方法,包括以下步骤:采集环境数据,根据环境数据获取施工数据;利用BIM建筑信息模型技术融合有限元模型技术建立桥梁缆索吊装模型,并添加照明系统;基于桥梁缆索吊装模型进行安装施工;实时采集环境数据和安装数据,获取施工风险预警等级,实时调整桥梁缆索吊装模型;桥梁安装完成后采集安装数据,评估桥梁安装是否合格并调整安装,建立桥梁抗洪晃动反演模型、桥梁抗震晃动反演模型和桥梁抗压晃动反演模型,评估桥梁的抗洪性能、抗震性能和抗压性能;将BIM建筑信息模型技术和有限元模型技术进行融合,可以及时准确地采集现场监测数据,并通过对数据的在线分析,把握桥梁施工动态,确保桥梁施工安全。
Bridge cable crane overall installation method
The invention discloses a bridge cable crane overall installation method which comprises the following steps: acquiring environmental data, and acquiring construction data according to the environmental data; a bridge cable hoisting model is established by combining a BIM building information model technology with a finite element model technology, and a lighting system is added; carrying out installation construction based on the bridge cable hoisting model; environment data and installation data are collected in real time, the construction risk early warning level is obtained, and the bridge cable hoisting model is adjusted in real time; after the bridge is installed, installation data are collected, whether bridge installation is qualified or not is evaluated, installation is adjusted, a bridge flood-fighting shake inversion model, a bridge anti-seismic shake inversion model and a bridge anti-compression shake inversion model are established, and the flood-fighting performance, the anti-seismic performance and the anti-compression performance of the bridge are evaluated; according to the method, the BIM building information model technology and the finite element model technology are fused, field monitoring data can be timely and accurately collected, the bridge construction dynamic state is grasped through online analysis of the data, and the bridge construction safety is ensured.
本发明公开了一种桥梁缆索吊总体安装方法,包括以下步骤:采集环境数据,根据环境数据获取施工数据;利用BIM建筑信息模型技术融合有限元模型技术建立桥梁缆索吊装模型,并添加照明系统;基于桥梁缆索吊装模型进行安装施工;实时采集环境数据和安装数据,获取施工风险预警等级,实时调整桥梁缆索吊装模型;桥梁安装完成后采集安装数据,评估桥梁安装是否合格并调整安装,建立桥梁抗洪晃动反演模型、桥梁抗震晃动反演模型和桥梁抗压晃动反演模型,评估桥梁的抗洪性能、抗震性能和抗压性能;将BIM建筑信息模型技术和有限元模型技术进行融合,可以及时准确地采集现场监测数据,并通过对数据的在线分析,把握桥梁施工动态,确保桥梁施工安全。
Bridge cable crane overall installation method
一种桥梁缆索吊总体安装方法
WANG CEN (Autor:in) / WANG JUN (Autor:in) / XU HONGSHAN (Autor:in) / BAI MING (Autor:in) / YUAN YI (Autor:in) / YAN PANFEI (Autor:in) / HAN XU (Autor:in) / TANG SHUBO (Autor:in)
21.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
E01D
BRIDGES
,
Brücken
/
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
G06N
COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
,
Rechnersysteme, basierend auf spezifischen Rechenmodellen
/
G08B
SIGNALLING OR CALLING SYSTEMS
,
Signalisier- oder Rufsysteme
/
H05B
ELECTRIC HEATING
,
Elektrische Heizung
Three-span cable crane for cable-stayed bridge girder installation and construction method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Cable-stayed bridge cable installation lifting device
Europäisches Patentamt | 2020
|Multifunctional deck crane for middle cable plane cable-stayed bridge
Europäisches Patentamt | 2022
|