Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Piston assembly of hydraulic breaking hammer
An external thread is arranged at the front part of a piston, an internal thread is arranged at the tail part of a drill rod, and the piston and the drill rod are connected through the external thread at the front part of the piston and the internal thread at the tail part of the drill rod; in order to prevent threads from loosening when the piston and the drill rod hit a target object, a drill rod nut is further arranged, and then the piston and the drill rod are connected through the drill rod nut.
本发明公开了一种液压破碎锤活塞组件,活塞的前部设置外螺纹,钎杆的尾部设置内螺纹,活塞和钎杆通过活塞前部的外螺纹和钎杆尾部的内螺纹进行连接;为了防止活塞和钎杆在打击目标物时发生螺纹松动,还设置了钎杆螺母,通过钎杆螺母再将活塞和钎杆连接。
Piston assembly of hydraulic breaking hammer
An external thread is arranged at the front part of a piston, an internal thread is arranged at the tail part of a drill rod, and the piston and the drill rod are connected through the external thread at the front part of the piston and the internal thread at the tail part of the drill rod; in order to prevent threads from loosening when the piston and the drill rod hit a target object, a drill rod nut is further arranged, and then the piston and the drill rod are connected through the drill rod nut.
本发明公开了一种液压破碎锤活塞组件,活塞的前部设置外螺纹,钎杆的尾部设置内螺纹,活塞和钎杆通过活塞前部的外螺纹和钎杆尾部的内螺纹进行连接;为了防止活塞和钎杆在打击目标物时发生螺纹松动,还设置了钎杆螺母,通过钎杆螺母再将活塞和钎杆连接。
Piston assembly of hydraulic breaking hammer
一种液压破碎锤活塞组件
TANG ZONGCAI (Autor:in)
28.01.2025
Patent
Elektronische Ressource
Chinesisch