TURM MIT EINEM ADAPTERSTÜCK SOWIE VERFAHREN ZUR HERSTELLUNG EINES TURMS MIT EINEM ADAPTERSTÜCK
The invention relates to a tower (1) comprising a lower tubular tower section (2) made of concrete, an upper tubular tower section (3) made of steel and an adapter piece (7) for connecting the two tower sections (2, 3). The adapter piece (7) consists of an annular concrete element (8) and a steel element (9), the steel element (9) containing at least one annular flange (9a) that covers preferably entirely a surface of the concrete element (8), said surface being at the top in the installed state. The steel element (9) is directly cast together with the concrete element (8), wherein the annular flange (9a) is completely underpoured, essentially without air inclusions. In a method for producing a tower (1) comprising an adapter piece (7), a steel element (9) having an annular flange (9a) is placed head down into an annular formwork in order to produce said adapter piece (7). A concrete material is then introduced into the formwork in order to produce an annular concrete element (8) of the adapter piece (7), whereby the concrete material is directly applied onto the subsequent bottom side of the flange (9a).
TURM MIT EINEM ADAPTERSTÜCK SOWIE VERFAHREN ZUR HERSTELLUNG EINES TURMS MIT EINEM ADAPTERSTÜCK
The invention relates to a tower (1) comprising a lower tubular tower section (2) made of concrete, an upper tubular tower section (3) made of steel and an adapter piece (7) for connecting the two tower sections (2, 3). The adapter piece (7) consists of an annular concrete element (8) and a steel element (9), the steel element (9) containing at least one annular flange (9a) that covers preferably entirely a surface of the concrete element (8), said surface being at the top in the installed state. The steel element (9) is directly cast together with the concrete element (8), wherein the annular flange (9a) is completely underpoured, essentially without air inclusions. In a method for producing a tower (1) comprising an adapter piece (7), a steel element (9) having an annular flange (9a) is placed head down into an annular formwork in order to produce said adapter piece (7). A concrete material is then introduced into the formwork in order to produce an annular concrete element (8) of the adapter piece (7), whereby the concrete material is directly applied onto the subsequent bottom side of the flange (9a).
TURM MIT EINEM ADAPTERSTÜCK SOWIE VERFAHREN ZUR HERSTELLUNG EINES TURMS MIT EINEM ADAPTERSTÜCK
TOWER COMPRISING AN ADAPTER PIECE AND METHOD FOR PRODUCING A TOWER COMPRISING AN ADAPTER PIECE
MÂT COMPRENANT UNE PIÈCE ADAPTATRICE ET PROCÉDÉ DE FABRICATION D'UN MÂT COMPRENANT UNE PIÈCE ADAPTATRICE
BÖGL STEFAN (Autor:in) / HIERL MARTIN (Autor:in) / KNITL JOSEF (Autor:in)
19.07.2017
Patent
Elektronische Ressource
Deutsch
ANORDNUNG MIT EINEM BETONFUNDAMENT UND EINEM TURM UND VERFAHREN ZUM ERRICHTEN EINES TURMS
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|Anordnung mit einem Betonfundament und einem Turm und Verfahren zum Errichten eines Turms
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2017
|Verfahren zum Errichten eines Turms, Turmsegments, Versorgungsstruktur sowie Turm