Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR FABRICATING PREFABRICATED PARALLEL STEEL WIRE PREFORMED CABLE STRANDS FOR MAIN CABLE OF SUSPENSION BRIDGE
A method for manufacturing prefabricated parallel steel wire preformed cable strands for a main cable of a suspension bridge, comprising: prefabricating a plurality of zinc-coated steel wires into cable strands in factory, wherein this step mainly comprises the fabrication and configuration of marked steel wires and standard steel wires and a steel wire placement and shaping procedure; preforming desired cross sections at positions of the cable strands corresponding to tower and splay saddles, in order to install the cable strands to the saddles. Both ends of each cable strand are anchored using hot-cast anchors, and then the cable strands are coiled and transported to the construction site, and then are mounted one by one. Due to high precision during fabrication, the cable strands have stable quality and can be quickly mounted.
METHOD FOR FABRICATING PREFABRICATED PARALLEL STEEL WIRE PREFORMED CABLE STRANDS FOR MAIN CABLE OF SUSPENSION BRIDGE
A method for manufacturing prefabricated parallel steel wire preformed cable strands for a main cable of a suspension bridge, comprising: prefabricating a plurality of zinc-coated steel wires into cable strands in factory, wherein this step mainly comprises the fabrication and configuration of marked steel wires and standard steel wires and a steel wire placement and shaping procedure; preforming desired cross sections at positions of the cable strands corresponding to tower and splay saddles, in order to install the cable strands to the saddles. Both ends of each cable strand are anchored using hot-cast anchors, and then the cable strands are coiled and transported to the construction site, and then are mounted one by one. Due to high precision during fabrication, the cable strands have stable quality and can be quickly mounted.
METHOD FOR FABRICATING PREFABRICATED PARALLEL STEEL WIRE PREFORMED CABLE STRANDS FOR MAIN CABLE OF SUSPENSION BRIDGE
VERFAHREN ZUR HERSTELLUNG VON VORGEFERTIGTEN, PARALLELEN VORGEFORMTEN STAHLDRAHT-KABELSTRÄNGEN FÜR DAS HAUPTKABEL EINER HÄNGEBRÜCKE
PROCÉDÉ DE FABRICATION DE BRINS DE CÂBLE PRÉFORMÉS À PARTIR DE FILS D'ACIER PARALLÈLES PRÉFABRIQUÉS POUR LE CÂBLE PRINCIPAL D'UN PONT SUSPENDU
ZHAO JUN (Autor:in) / NING SHIWEI (Autor:in) / XUE HUAJUAN (Autor:in) / ZHOU ZHUBING (Autor:in) / WU QIONG (Autor:in) / QIANG QIANG (Autor:in) / HUANG KEBIN (Autor:in) / ZHU XIAOXIONG (Autor:in) / SHU WEIHONG (Autor:in) / WANG JIN (Autor:in)
08.05.2019
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2020
|Device for looping parallel steel wire strands of main cable for suspension bridge
Europäisches Patentamt | 2021
|Method for fabricating wire strand for main cable of suspension bridge
Europäisches Patentamt | 2020
|METHOD FOR FABRICATING WIRE STRAND FOR MAIN CABLE OF SUSPENSION BRIDGE
Europäisches Patentamt | 2018
|Saddle-entering shaping method for cable strands of rotary main cable suspension bridge
Europäisches Patentamt | 2022
|