Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.
A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.
COMBINATION PIER
KOMBINATIONSPFEILER
PILIER COMBINÉ
THOMAS RONALD D (Autor:in)
17.03.2021
Patent
Elektronische Ressource
Englisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Illinois city constructs combination pier and sewer
Engineering Index Backfile | 1948
|