Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONTROLLING MOVEMENT OF A CANTILEVER STRUCTURE OF AN OFFSHORE PLATFORM
For controlling movement of a cantilever of an offshore platform, displacements required for displacing an item to a target position including longitudinal skidding displacement and transverse skidding displacement of the cantilever of the cantilever are determined from current position data and target position data. From position dependent support load data support loads during the longitudinal skidding displacement are determined. If and until a sum of support loads or a highest support load decreases during the longitudinal skidding displacement towards the target position, the longitudinal skidding displacement precedes the transverse skidding displacement. If a sum of support loads or a highest support load increases during the longitudinal skidding displacement towards the target position, the transverse skidding displacement towards the target position precedes the longitudinal skidding displacement.
CONTROLLING MOVEMENT OF A CANTILEVER STRUCTURE OF AN OFFSHORE PLATFORM
For controlling movement of a cantilever of an offshore platform, displacements required for displacing an item to a target position including longitudinal skidding displacement and transverse skidding displacement of the cantilever of the cantilever are determined from current position data and target position data. From position dependent support load data support loads during the longitudinal skidding displacement are determined. If and until a sum of support loads or a highest support load decreases during the longitudinal skidding displacement towards the target position, the longitudinal skidding displacement precedes the transverse skidding displacement. If a sum of support loads or a highest support load increases during the longitudinal skidding displacement towards the target position, the transverse skidding displacement towards the target position precedes the longitudinal skidding displacement.
CONTROLLING MOVEMENT OF A CANTILEVER STRUCTURE OF AN OFFSHORE PLATFORM
STEUERUNG DER BEWEGUNG EINER FREITRAGENDEN STRUKTUR EINER OFFSHORE-PLATTFORM
RÉGULATION DU MOUVEMENT D'UNE STRUCTURE EN PORTE-À-FAUX D'UNE PLATE-FORME EN MER
BADENBERG THEODORUS WILHELMUS MARIA (Autor:in) / DE BRUIJN RENÉ (Autor:in)
28.12.2022
Patent
Elektronische Ressource
Englisch
Controlling movement of a cantilever structure of an offshore platform
Europäisches Patentamt | 2023
|CONTROLLING MOVEMENT OF A CANTILEVER STRUCTURE OF AN OFFSHORE PLATFORM
Europäisches Patentamt | 2021
|CONTROLLING MOVEMENT OF A CANTILEVER STRUCTURE OF AN OFFSHORE PLATFORM
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2018
|Europäisches Patentamt | 2020
|