Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
EARTHWORK BAG BODY AND EARTHWORK STRUCTURE
[Problems to be solved] A bag body for civil engineering work and a structure body for civil engineering work are provided, by which a problem caused by filler material to damage the bag body and a problem of a mesh of the bag body caused to be torn by lifting a lifting rope, could be solved simultaneously.[Means for solving problems] A bag body for civil engineering work includes: a bag body 21 having a mesh shape; a mouth-narrowing rope so inserted through a mesh in proximity to an opening of the bag body 21 as to be attached thereto; a lifting rope 27 of an endless structure so inserted through a mesh in a lower position with respect to the mouth-narrowing rope as to be attached thereto; and an intermediate-mouth narrowing rope 28 so inserted through a mesh in a lower position with respect to the lifting rope 27 as to be attached thereto, wherein the intermediate-mouth narrowing rope 28 is attached to a part of an unhousing portion 25 for not housing filler material 30 at an upper half of the bag body 21, and, when the lifting rope 27 is lifted, a constriction occurs at a part, of the unhousing portion 25, attached with the intermediate-mouth narrowing rope 28.
EARTHWORK BAG BODY AND EARTHWORK STRUCTURE
[Problems to be solved] A bag body for civil engineering work and a structure body for civil engineering work are provided, by which a problem caused by filler material to damage the bag body and a problem of a mesh of the bag body caused to be torn by lifting a lifting rope, could be solved simultaneously.[Means for solving problems] A bag body for civil engineering work includes: a bag body 21 having a mesh shape; a mouth-narrowing rope so inserted through a mesh in proximity to an opening of the bag body 21 as to be attached thereto; a lifting rope 27 of an endless structure so inserted through a mesh in a lower position with respect to the mouth-narrowing rope as to be attached thereto; and an intermediate-mouth narrowing rope 28 so inserted through a mesh in a lower position with respect to the lifting rope 27 as to be attached thereto, wherein the intermediate-mouth narrowing rope 28 is attached to a part of an unhousing portion 25 for not housing filler material 30 at an upper half of the bag body 21, and, when the lifting rope 27 is lifted, a constriction occurs at a part, of the unhousing portion 25, attached with the intermediate-mouth narrowing rope 28.
EARTHWORK BAG BODY AND EARTHWORK STRUCTURE
ERDARBEITSBEUTELKÖRPER UND ERDBARBEITSSTRUKTUR
CORPS DE SAC DE TERRASSEMENT ET STRUCTURE DE TERRASSEMENT
MURAKAMI YOSHINORI (Autor:in) / ISAKA SHINGO (Autor:in) / KAWABATA SATOSHI (Autor:in)
01.06.2022
Patent
Elektronische Ressource
Englisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
B65D
Behältnisse zur Lagerung oder zum Transport von Gegenständen oder Materialien [Container], z.B. Säcke, Beutel, Fässer, Flaschen, Dosen, Kästen, Büchsen, Schachteln, Packkörbe, Tonnen, Gläser, Flüssigkeitsbehälter, Trichtersilos, Transportbehälter
,
CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS
/
E02D
FOUNDATIONS
,
Gründungen
TIBKAT | 1982
|NTIS | 1982
|