Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
JIG SET FOR CONSTRUCTING CEILING ANCHOR BOLT AND INSTALLING FULL THREAD BOLT AND FULL THREAD BOLT CONSTRUCTION METHOD USING SAME
The present invention relates to a jig tool set for constructing a full thread bolt, and a method of constructing a full thread bolt using the same, wherein the jig too set includes a drill bit, a connecting rod, an anchor bot set, a full thread bolt, and a drill gun, so that a worker performs drilling work for a ceiling slab and a full thread bolt installation work at once in place, thereby improving work efficiency and securing safety.To this end, the present invention includes a drill bit in which a drilling part is formed to secure a hole having a certain depth by drilling a ceiling slab made of concrete at one end thereof, an anchor bolt set fixed to the hole formed in the ceiling slab through the drill bit and configured to form a full thread bolt having a certain length in the ceiling slab, a connecting rod having a certain length so that, as the drill bit and the anchor bolt set are sequentially seated at one end thereof, a worker that performs drilling work and full thread bolt installation work performs the work on the ground without moving to a location close to the ceiling slab, and a drill gun formed at the other end of the connecting rod and configured to provide a rotational force and a hitting force so that the drilling work and the full thread bolt installation work are performed on the ground.
JIG SET FOR CONSTRUCTING CEILING ANCHOR BOLT AND INSTALLING FULL THREAD BOLT AND FULL THREAD BOLT CONSTRUCTION METHOD USING SAME
The present invention relates to a jig tool set for constructing a full thread bolt, and a method of constructing a full thread bolt using the same, wherein the jig too set includes a drill bit, a connecting rod, an anchor bot set, a full thread bolt, and a drill gun, so that a worker performs drilling work for a ceiling slab and a full thread bolt installation work at once in place, thereby improving work efficiency and securing safety.To this end, the present invention includes a drill bit in which a drilling part is formed to secure a hole having a certain depth by drilling a ceiling slab made of concrete at one end thereof, an anchor bolt set fixed to the hole formed in the ceiling slab through the drill bit and configured to form a full thread bolt having a certain length in the ceiling slab, a connecting rod having a certain length so that, as the drill bit and the anchor bolt set are sequentially seated at one end thereof, a worker that performs drilling work and full thread bolt installation work performs the work on the ground without moving to a location close to the ceiling slab, and a drill gun formed at the other end of the connecting rod and configured to provide a rotational force and a hitting force so that the drilling work and the full thread bolt installation work are performed on the ground.
JIG SET FOR CONSTRUCTING CEILING ANCHOR BOLT AND INSTALLING FULL THREAD BOLT AND FULL THREAD BOLT CONSTRUCTION METHOD USING SAME
SPANNSET ZUR KONSTRUKTION EINES DECKENANKERBOLZENS UND INSTALLATION EINES VOLLGEWINDEBOLZENS UND VOLLGEWINDEBOLZENKONSTRUKTIONSVERFAHREN DAMIT
ENSEMBLE GABARIT POUR CONSTRUIRE UN BOULON D'ANCRAGE DE PLAFOND ET INSTALLER UN BOULON ENTIÈREMENT FILETÉ ET PROCÉDÉ DE CONSTRUCTION DE BOULON ENTIÈREMENT FILETÉ L'UTILISANT
SONG YUN KU (Autor:in)
31.07.2024
Patent
Elektronische Ressource
Englisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Full thread bolt assembly for installating ceiling structure and its construction method
Europäisches Patentamt | 2024
|Anchor bolt installing structure and anchor bolt installing method
Europäisches Patentamt | 2020
|