Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PRECAST-CONCRETE STAIRWAY ROOM CONSTRUCTION METHOD
The present invention relates to a precast-concrete stairway room construction method for constructing a stairway room with one coupling operation by manufacturing the stairway room to have a structure formed by vertically dividing the stairway room into left and right sides, wherein the construction method comprises: a mold preparing step (S10) in which a first mold and a second mold are prepared; a rebar arranging step (S20) in which rebars are arranged in the prepared first and second molds; a concrete placing and curing step (S30) in which concrete is placed and cured in the first mold and the second mold; a divided structure manufacturing step (S40) in which a first divided structure and a second divided structure formed in the first mold and the second mold are removed to finish the manufacturing of the first divided structure and the second divided structure; a structure attaching step (S50) in which the first divided structure and the second divided structure are made to come into close contact with each other; and a structure bonding step (S60) in which the first divided structure and the second divided structure that are in close contact with each other are bonded to each other.
PRECAST-CONCRETE STAIRWAY ROOM CONSTRUCTION METHOD
The present invention relates to a precast-concrete stairway room construction method for constructing a stairway room with one coupling operation by manufacturing the stairway room to have a structure formed by vertically dividing the stairway room into left and right sides, wherein the construction method comprises: a mold preparing step (S10) in which a first mold and a second mold are prepared; a rebar arranging step (S20) in which rebars are arranged in the prepared first and second molds; a concrete placing and curing step (S30) in which concrete is placed and cured in the first mold and the second mold; a divided structure manufacturing step (S40) in which a first divided structure and a second divided structure formed in the first mold and the second mold are removed to finish the manufacturing of the first divided structure and the second divided structure; a structure attaching step (S50) in which the first divided structure and the second divided structure are made to come into close contact with each other; and a structure bonding step (S60) in which the first divided structure and the second divided structure that are in close contact with each other are bonded to each other.
PRECAST-CONCRETE STAIRWAY ROOM CONSTRUCTION METHOD
BAUVERFAHREN FÜR TREPPENRAUM AUS VORGEFERTIGTEM BETON
PROCÉDÉ DE CONSTRUCTION D'UNE CAGE D'ESCALIER EN BÉTON PRÉFABRIQUÉ
CHO YEONG CHEOL (Autor:in) / YOO KWANG JOON (Autor:in) / HAN BYUNG MIN (Autor:in)
18.09.2024
Patent
Elektronische Ressource
Englisch
CONSTRUCTION METHOD OF STAIRWAY ROOM, AND STAIRWAY ROOM STRUCTURE
Europäisches Patentamt | 2023
|STAIRWAY SET, STAIRWAY, PACKAGING METHOD FOR STAIRWAY FOOTBOARD, AND STAIRWAY CONSTRUCTION METHOD
Europäisches Patentamt | 2016
|STAIRWAY SUBSTRATE STRUCTURE, STAIRWAY, AND CONSTRUCTION METHOD OF STAIRWAY
Europäisches Patentamt | 2018
|