Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method and system for predicting boulder in front of tunneling by shield tunneling machine
Provided are a method and system for predicting a boulder lying ahead in tunneling progression of a tunnel boring machine. The method comprises: determining a torque coefficient of a tunnel boring machine according to a cutterhead torque which is collected during tunneling of the tunnel boring machine, so as to calculate a theoretical torque during tunneling of the tunnel boring machine; in response to a change in the cutterhead torque which is greater than 10% of the theoretical torque, determining that the tunnel boring machine encounters a boulder during tunneling; and on the basis of a preset boulder prediction model, determining the position and the size of the boulder according to the rotating speed of a cutterhead and a tunneling speed during tunneling of the tunnel boring machine. Therefore, by means of the roller cutter stress, tunneling speed and cutterhead torque during tunneling of a tunnel boring machine, whether the tunnel boring machine encounters a boulder during tunneling and the position and the size of a boulder encountered in front of the tunnel boring machine can be effectively determined. The method has simple operation and low costs, and can conveniently and quickly predict a boulder, thereby ensuring the tunneling safety of the tunnel boring machine.
Method and system for predicting boulder in front of tunneling by shield tunneling machine
Provided are a method and system for predicting a boulder lying ahead in tunneling progression of a tunnel boring machine. The method comprises: determining a torque coefficient of a tunnel boring machine according to a cutterhead torque which is collected during tunneling of the tunnel boring machine, so as to calculate a theoretical torque during tunneling of the tunnel boring machine; in response to a change in the cutterhead torque which is greater than 10% of the theoretical torque, determining that the tunnel boring machine encounters a boulder during tunneling; and on the basis of a preset boulder prediction model, determining the position and the size of the boulder according to the rotating speed of a cutterhead and a tunneling speed during tunneling of the tunnel boring machine. Therefore, by means of the roller cutter stress, tunneling speed and cutterhead torque during tunneling of a tunnel boring machine, whether the tunnel boring machine encounters a boulder during tunneling and the position and the size of a boulder encountered in front of the tunnel boring machine can be effectively determined. The method has simple operation and low costs, and can conveniently and quickly predict a boulder, thereby ensuring the tunneling safety of the tunnel boring machine.
Method and system for predicting boulder in front of tunneling by shield tunneling machine
10.05.2023
Patent
Elektronische Ressource
Englisch
Shield Tunneling Treatment Technology in Boulder Stratum
Springer Verlag | 2021
|Predicting boulder cutting in soft ground tunneling
British Library Conference Proceedings | 2002
|Mud concentration type shield tunneling construction method for shield tunneling machine
Europäisches Patentamt | 2015
|Compact shield tunneling method
British Library Conference Proceedings | 2005
|