Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lifting and reinforcing process for dust-free factory floor
Disclosed in the present invention is a lifting and reinforcing process for a dust-free factory floor, including: reinforcing a soft foundation and precisely lifting a settlement range. Reinforcing a soft foundation includes: step 1: determining a depth of a soft soil layer in an inner settlement area of the factory, and designing a drilling curve; step 2: drilling guiding holes from the outer construction point of the factory; step 3: connecting and communicating grouting channels; and step 4: grouting. Lifting a settlement area includes: step 1: determining a depth range between the reinforced soft foundation and the floor, and designing the drilling curve; step 2: drilling the guiding holes; step 3: connecting and communicating the grouting channels; step 4: starting grouting; and step 5: stopping grouting.
Lifting and reinforcing process for dust-free factory floor
Disclosed in the present invention is a lifting and reinforcing process for a dust-free factory floor, including: reinforcing a soft foundation and precisely lifting a settlement range. Reinforcing a soft foundation includes: step 1: determining a depth of a soft soil layer in an inner settlement area of the factory, and designing a drilling curve; step 2: drilling guiding holes from the outer construction point of the factory; step 3: connecting and communicating grouting channels; and step 4: grouting. Lifting a settlement area includes: step 1: determining a depth range between the reinforced soft foundation and the floor, and designing the drilling curve; step 2: drilling the guiding holes; step 3: connecting and communicating the grouting channels; step 4: starting grouting; and step 5: stopping grouting.
Lifting and reinforcing process for dust-free factory floor
16.10.2024
Patent
Elektronische Ressource
Englisch
Lifting and reinforcing process for dust-free factory floor
Europäisches Patentamt | 2024
|LIFTING AND REINFORCING PROCESS FOR DUST-FREE FACTORY FLOOR
Europäisches Patentamt | 2023
|LIFTING AND REINFORCING PROCESS FOR DUST-FREE FACTORY FLOOR
Europäisches Patentamt | 2024
|Precise horizontal lifting and reinforcing process for dust-free plant terrace
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1931
|