Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a built-up house having versatility, and also having large strength, for enabling assembling-disassembling work in a short time.SOLUTION: The built-up house comprises a base 2, a main column 4, an intermediate column 5, a wall member 3c and a roof 6, and a mortice of extending in the vertical direction is formed on a side surface opposed to the wall 3c of he main column 4, and a tenon fitted to the mortice of the main column 4 is formed on left-right side surfaces of the wall 3c. A base installing bolt 17 is provided in a lower end part of the main column 4 and the intermediate column 5, and a roof installing bolt 16 for installing a roof 6 is provided in an upper end part of the main column 4 and the intermediate column 5, and in the main column 4 and the intermediate column 5, the base installing bolt 17 and the roof installing bolt 16 are installed on the bse 2 and the roof 6 by a nut.
【課題】組立て、分解が短時間で作業が可能であり、汎用性を有し、しかも強度の大きな組立ハウスを提供すること。【解決手段】組立ハウスは、ベース2と、主柱4と、中間支柱5と、壁部材3cと、屋根6とを備え、主柱4の壁3cと向かい合う側面には、上下方向に延びるほぞ孔が形成され、壁3cの左右側面には、主柱4のほぞ孔に嵌合するほぞが形成されている。主柱4及び中間支柱5の下端部には、ベース取付ボルト17が設けられ、主柱4及び中間支柱5の上端部には屋根6を取付ける屋根取付ボルト16が設けられ、主柱4及び中間支柱5は、ベース取付ボルト17及び屋根取付ボルト16をナットによってベース2と屋根6に組み付けるようにした。【選択図】図3
PROBLEM TO BE SOLVED: To provide a built-up house having versatility, and also having large strength, for enabling assembling-disassembling work in a short time.SOLUTION: The built-up house comprises a base 2, a main column 4, an intermediate column 5, a wall member 3c and a roof 6, and a mortice of extending in the vertical direction is formed on a side surface opposed to the wall 3c of he main column 4, and a tenon fitted to the mortice of the main column 4 is formed on left-right side surfaces of the wall 3c. A base installing bolt 17 is provided in a lower end part of the main column 4 and the intermediate column 5, and a roof installing bolt 16 for installing a roof 6 is provided in an upper end part of the main column 4 and the intermediate column 5, and in the main column 4 and the intermediate column 5, the base installing bolt 17 and the roof installing bolt 16 are installed on the bse 2 and the roof 6 by a nut.
【課題】組立て、分解が短時間で作業が可能であり、汎用性を有し、しかも強度の大きな組立ハウスを提供すること。【解決手段】組立ハウスは、ベース2と、主柱4と、中間支柱5と、壁部材3cと、屋根6とを備え、主柱4の壁3cと向かい合う側面には、上下方向に延びるほぞ孔が形成され、壁3cの左右側面には、主柱4のほぞ孔に嵌合するほぞが形成されている。主柱4及び中間支柱5の下端部には、ベース取付ボルト17が設けられ、主柱4及び中間支柱5の上端部には屋根6を取付ける屋根取付ボルト16が設けられ、主柱4及び中間支柱5は、ベース取付ボルト17及び屋根取付ボルト16をナットによってベース2と屋根6に組み付けるようにした。【選択図】図3
BUILT-UP HOUSE
組立ハウス
SASAKI MITSUO (Autor:in)
04.06.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
NTIS | 1994
British Library Online Contents | 2005
|