Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONNECTOR, CONNECTION METHOD AND STONE STRUCTURE
PROBLEM TO BE SOLVED: To flexibly and strongly connect components of a structure to each other.SOLUTION: Four turf stones 4 are connected by connectors 11 in a foundation section 2 of a stone structure. Each of the connectors 11 includes flexible belts 12 laid over the two adjacent turf stones 4, two sheets of pressing metal fittings 13 for pressing both ends of the flexible belts 12 on the corresponding turf stones 4, and a pair of bolts 14 for jointly fastening the pressing metal fittings 13 and the flexible belts 12 to the turf stones 4. Reinforcing wires are buried into the whole lengths of the flexible belts 12. After the pressing metal fittings 13 are slid and the flexible belts 12 are fastened so that the lengths of the flexible parts are reduced in temporarily fastening states of the bolts 14, the bolts 14 are finally fastened.
【課題】 構造物の構成要素同士を柔軟に接続しかつ強固に連結する。【解決手段】 石材構造物の土台部2において、4本の芝石4を連結具11で連結する。連結具11は、隣接する2本の芝石4に架け渡される可撓ベルト12と、可撓ベルト12の両端部を対応する芝石4に押し当てる2枚の押え金具13と、押え金具13と可撓ベルト12を芝石4に共締めする一対のボルト14を備える。可撓ベルト12の全長に補強ワイヤを埋設する。ボルト14の仮締め状態で、押え金具13をスライドし、可撓部分の長さが縮小するように可撓ベルト12を締め込んだのち、ボルト14を本締めする。【選択図】 図2
CONNECTOR, CONNECTION METHOD AND STONE STRUCTURE
PROBLEM TO BE SOLVED: To flexibly and strongly connect components of a structure to each other.SOLUTION: Four turf stones 4 are connected by connectors 11 in a foundation section 2 of a stone structure. Each of the connectors 11 includes flexible belts 12 laid over the two adjacent turf stones 4, two sheets of pressing metal fittings 13 for pressing both ends of the flexible belts 12 on the corresponding turf stones 4, and a pair of bolts 14 for jointly fastening the pressing metal fittings 13 and the flexible belts 12 to the turf stones 4. Reinforcing wires are buried into the whole lengths of the flexible belts 12. After the pressing metal fittings 13 are slid and the flexible belts 12 are fastened so that the lengths of the flexible parts are reduced in temporarily fastening states of the bolts 14, the bolts 14 are finally fastened.
【課題】 構造物の構成要素同士を柔軟に接続しかつ強固に連結する。【解決手段】 石材構造物の土台部2において、4本の芝石4を連結具11で連結する。連結具11は、隣接する2本の芝石4に架け渡される可撓ベルト12と、可撓ベルト12の両端部を対応する芝石4に押し当てる2枚の押え金具13と、押え金具13と可撓ベルト12を芝石4に共締めする一対のボルト14を備える。可撓ベルト12の全長に補強ワイヤを埋設する。ボルト14の仮締め状態で、押え金具13をスライドし、可撓部分の長さが縮小するように可撓ベルト12を締め込んだのち、ボルト14を本締めする。【選択図】 図2
CONNECTOR, CONNECTION METHOD AND STONE STRUCTURE
連結具、連結工法および石材構造物
SUGITA KIKUO (Autor:in)
25.06.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Europäisches Patentamt | 2021
|CONNECTOR, CONNECTION STRUCTURE, AND CONNECTION METHOD
Europäisches Patentamt | 2020
|CONNECTOR, CONNECTION STRUCTURE, AND CONNECTION METHOD
Europäisches Patentamt | 2021
|CONNECTOR, CONNECTION STRUCTURE, AND METHOD FOR MANUFACTURING CONNECTION STRUCTURE
Europäisches Patentamt | 2023
|CONNECTOR, CONNECTION STRUCTURE, AND METHOD FOR MANUFACTURING CONNECTION STRUCTURE
Europäisches Patentamt | 2022
|