Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WIRE ARRANGEMENT STRUCTURE OF CONSTRUCTION MACHINE
PROBLEM TO BE SOLVED: To fix many pipes orderly, efficiently, tightly in a limited space and also to improve efficiency of wire arrangement work and maintenance work after that.SOLUTION: A wire arrangement plate 21 is arranged in a wire arrangement space, where pipes etc., are run, in a right-left direction orthogonal to the length direction of the pipes 13 etc. The wire arrangement plate 21 is provided with a cut band through groove 22 which is made open laterally to both right and left end parts as a band through part where a fixing band for fastening and fixing a bundle of the pipes 13 etc., is run, with a band through slit 23 which is made open backward to a center part, and with a band through hole 24 therebetween, at intervals so that wire arrangement spaces are sectioned and formed between them, and the pipes etc., are divided into a plurality of groups and fixed to the respective wire arrangement spaces.
【課題】多数の配管類を整然と、かつ、限られたスペースに効率良く、しかも強固に固定できるとともに、配索作業及びその後のメンテナンス作業の能率を良くする。【解決手段】配管類が通される配索空間に配索プレート21を、配管類13の長さ方向と直交する左右方向に設ける。この配索プレート21には、配管類13の束を結束固定する固定バンドが通されるバンド通し部として、左右両端部に横向きに開放する切欠状のバンド通し溝22、中央部に後向きに開放するバンド通しスリット23、これらの間にバンド通し穴24を、互いの間に配索スペースが区画形成されるように間隔を置いて設け、配管類を複数の組に分けて各配索スペースに固定するように構成した。【選択図】図7
WIRE ARRANGEMENT STRUCTURE OF CONSTRUCTION MACHINE
PROBLEM TO BE SOLVED: To fix many pipes orderly, efficiently, tightly in a limited space and also to improve efficiency of wire arrangement work and maintenance work after that.SOLUTION: A wire arrangement plate 21 is arranged in a wire arrangement space, where pipes etc., are run, in a right-left direction orthogonal to the length direction of the pipes 13 etc. The wire arrangement plate 21 is provided with a cut band through groove 22 which is made open laterally to both right and left end parts as a band through part where a fixing band for fastening and fixing a bundle of the pipes 13 etc., is run, with a band through slit 23 which is made open backward to a center part, and with a band through hole 24 therebetween, at intervals so that wire arrangement spaces are sectioned and formed between them, and the pipes etc., are divided into a plurality of groups and fixed to the respective wire arrangement spaces.
【課題】多数の配管類を整然と、かつ、限られたスペースに効率良く、しかも強固に固定できるとともに、配索作業及びその後のメンテナンス作業の能率を良くする。【解決手段】配管類が通される配索空間に配索プレート21を、配管類13の長さ方向と直交する左右方向に設ける。この配索プレート21には、配管類13の束を結束固定する固定バンドが通されるバンド通し部として、左右両端部に横向きに開放する切欠状のバンド通し溝22、中央部に後向きに開放するバンド通しスリット23、これらの間にバンド通し穴24を、互いの間に配索スペースが区画形成されるように間隔を置いて設け、配管類を複数の組に分けて各配索スペースに固定するように構成した。【選択図】図7
WIRE ARRANGEMENT STRUCTURE OF CONSTRUCTION MACHINE
建設機械の配索構造
OKADA SHUJI (Autor:in)
30.07.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E02F
Baggern
,
DREDGING