Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
AVALANCHE DETECTION SYSTEM
PROBLEM TO BE SOLVED: To provide a new avalanche detection system.SOLUTION: Both of a master weight measurement part 11 and a slave weight measurement part 12 can measure weight of snow on own machines, and are arranged at an interval along an inclination direction of a slope 4 where there is possibility of an avalanche. When a weight change exceeding a threshold is detected in short time, the slave weight measurement part 12 outputs data of detected timing t2 and the maximum weight change amount ΔVCmax to the master weight measurement part 11. The master weight measurement part 11 calculates a time difference Δt from the timing t2 in which the weight change exceeding the threshold is detected in the own machine and received timing t1, performs avalanche detection determination, and determines an avalanche scale based on the magnitude of the weight change (an average of ΔVPmax and VCmax) and the time difference Δt. Then, a detection signal of occurrence of the avalanche including scale information is output by radio.
【課題】新しい雪崩検知システムを提供する。【解決手段】親重量計測部11と子重量計測部12は、ともに自機の上の雪の重量を計測することのできる装置であって、雪崩の可能性がある斜面4の傾斜方向に沿って離隔して配置される。子重量計測部12は、短時間に閾値を超える重量変化を検知すると、検知したタイミングt2と最大重量変化量ΔVCmaxのデータを親重量計測部12へ出力する。親重量計測部11は、自機において閾値を超える重量変化を検知したタイミングt2と受信したタイミングt1とから時間差Δtを算出し、重量変化の大きさ(ΔVPmaxとΔVCmaxの平均値)と時間差Δtとに基づいて雪崩検知判定と雪崩規模を判定する。そして、規模情報を含む雪崩発生の検知信号を無線出力する。【選択図】図3
AVALANCHE DETECTION SYSTEM
PROBLEM TO BE SOLVED: To provide a new avalanche detection system.SOLUTION: Both of a master weight measurement part 11 and a slave weight measurement part 12 can measure weight of snow on own machines, and are arranged at an interval along an inclination direction of a slope 4 where there is possibility of an avalanche. When a weight change exceeding a threshold is detected in short time, the slave weight measurement part 12 outputs data of detected timing t2 and the maximum weight change amount ΔVCmax to the master weight measurement part 11. The master weight measurement part 11 calculates a time difference Δt from the timing t2 in which the weight change exceeding the threshold is detected in the own machine and received timing t1, performs avalanche detection determination, and determines an avalanche scale based on the magnitude of the weight change (an average of ΔVPmax and VCmax) and the time difference Δt. Then, a detection signal of occurrence of the avalanche including scale information is output by radio.
【課題】新しい雪崩検知システムを提供する。【解決手段】親重量計測部11と子重量計測部12は、ともに自機の上の雪の重量を計測することのできる装置であって、雪崩の可能性がある斜面4の傾斜方向に沿って離隔して配置される。子重量計測部12は、短時間に閾値を超える重量変化を検知すると、検知したタイミングt2と最大重量変化量ΔVCmaxのデータを親重量計測部12へ出力する。親重量計測部11は、自機において閾値を超える重量変化を検知したタイミングt2と受信したタイミングt1とから時間差Δtを算出し、重量変化の大きさ(ΔVPmaxとΔVCmaxの平均値)と時間差Δtとに基づいて雪崩検知判定と雪崩規模を判定する。そして、規模情報を含む雪崩発生の検知信号を無線出力する。【選択図】図3
AVALANCHE DETECTION SYSTEM
雪崩検知システム
IIKURA SHIGEHIRO (Autor:in) / TAKAHASHI DAISUKE (Autor:in) / SATO RYOTA (Autor:in) / YAMAMOTO KATSUYA (Autor:in) / MAMADA SHOGO (Autor:in)
05.10.2015
Patent
Elektronische Ressource
Japanisch
IPC:
G01V
Geophysik
,
GEOPHYSICS
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
G01D
MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE
,
Anzeigen oder Aufzeichnen in Verbindung mit Messen allgemein