Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONFIRMATION METHOD FOR CONSTRUCTION STATE OF SPRAYED MORTAR
PROBLEM TO BE SOLVED: To provide a confirmation method for the construction state of sprayed mortar that allows the construction state of sprayed mortar sprayed by a dry spray method to be promptly and easily confirmed.SOLUTION: The confirmation method for the construction state of sprayed mortar sprayed by a dry spray method is provided that comprises: a standard formation step in which a standard mortar of a prescribed thickness is formed by spraying a mixture of powdery materials and liquid materials of prescribed ratios from a spray nozzle; a sprayed ratio calculation step in which the sprayed mortar ratio, representing the ratio of the mass of the standard mortar to the total flow of the powdery materials and liquid materials sprayed from the spray nozzle in the standard mortar formation step, is calculated; and a sprayed amount estimation step in which the estimated mass of sprayed mortar is calculated by multiplying the total mass of the powdery materials and liquid materials sprayed from the spray nozzle when forming the sprayed mortar by the sprayed mortar ratio.
【課題】乾式吹付け工法によって吹付けられてなる吹付けモルタルの施工状態を迅速かつ容易に確認することができる吹付けモルタルの施工状態の確認方法を提供することを課題とする。【解決手段】乾式吹付け工法によって吹付けられてなる吹付けモルタルの施工状態を確認する吹付けモルタルの施工状態の確認方法であって、粉体材料と液体材料とを所定の割合で吹付け用ノズルから噴射して所定厚みの基準モルタルを形成する基準形成工程と、該基準形成工程において吹付け用ノズルから噴射された粉体材料と液体材料との合計流量に対する基準モルタルの質量割合をモルタル吹付け率として算出する吹付け率算出工程と、吹付けモルタルを形成する際に吹付け用ノズルから噴射される粉体材料と液体材料との合計質量にモルタル吹付け率を乗じて吹付けモルタルの質量の推定値を算出する吹付け量推定工程とを備えることを特徴とする。【選択図】なし
CONFIRMATION METHOD FOR CONSTRUCTION STATE OF SPRAYED MORTAR
PROBLEM TO BE SOLVED: To provide a confirmation method for the construction state of sprayed mortar that allows the construction state of sprayed mortar sprayed by a dry spray method to be promptly and easily confirmed.SOLUTION: The confirmation method for the construction state of sprayed mortar sprayed by a dry spray method is provided that comprises: a standard formation step in which a standard mortar of a prescribed thickness is formed by spraying a mixture of powdery materials and liquid materials of prescribed ratios from a spray nozzle; a sprayed ratio calculation step in which the sprayed mortar ratio, representing the ratio of the mass of the standard mortar to the total flow of the powdery materials and liquid materials sprayed from the spray nozzle in the standard mortar formation step, is calculated; and a sprayed amount estimation step in which the estimated mass of sprayed mortar is calculated by multiplying the total mass of the powdery materials and liquid materials sprayed from the spray nozzle when forming the sprayed mortar by the sprayed mortar ratio.
【課題】乾式吹付け工法によって吹付けられてなる吹付けモルタルの施工状態を迅速かつ容易に確認することができる吹付けモルタルの施工状態の確認方法を提供することを課題とする。【解決手段】乾式吹付け工法によって吹付けられてなる吹付けモルタルの施工状態を確認する吹付けモルタルの施工状態の確認方法であって、粉体材料と液体材料とを所定の割合で吹付け用ノズルから噴射して所定厚みの基準モルタルを形成する基準形成工程と、該基準形成工程において吹付け用ノズルから噴射された粉体材料と液体材料との合計流量に対する基準モルタルの質量割合をモルタル吹付け率として算出する吹付け率算出工程と、吹付けモルタルを形成する際に吹付け用ノズルから噴射される粉体材料と液体材料との合計質量にモルタル吹付け率を乗じて吹付けモルタルの質量の推定値を算出する吹付け量推定工程とを備えることを特徴とする。【選択図】なし
CONFIRMATION METHOD FOR CONSTRUCTION STATE OF SPRAYED MORTAR
吹付けモルタルの施工状態の確認方法
MOCHIDA YASUKO (Autor:in) / YAMAMOTO MAKOTO (Autor:in) / YOSHIHARA MASAHIRO (Autor:in) / TANAKA TSUTOMU (Autor:in)
02.11.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
MORTAR-SPRAYED SURFACE AUTOMATIC LEVELER AND MORTAR-SPRAYED SURFACE AUTOMATIC LEVELING METHOD
Europäisches Patentamt | 2017
|SPRAYED CONCRETE - Construction and repair with wet-process sprayed concrete and mortar
Online Contents | 2000
Preparation and construction method of machine-sprayed phosphogypsum lightweight plastering mortar
Europäisches Patentamt | 2022
|Construction and repair with wet-process sprayed concrete and mortar
British Library Online Contents | 2000