Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
TEMPORARILY RECEIVING JACK FIXATION STRUCTURE
PROBLEM TO BE SOLVED: To provide a temporarily receiving jack fixation structure that eliminates the need to drill a skeleton and then install a post-construction anchor and thereby prevents the skeleton from deteriorating in strength, and requires none of various reinforcing bar survey tests such as a previous reinforcing bar survey test, a tension test, and an installation length confirmation test.SOLUTION: A temporarily receiving jack fixation structure is formed by: arranging a bottom plate 2 on a temporarily receiving jack 1; charging shrinkage-compensating mortar 3 between a haunch part 7 of a viaduct 6 and the bottom plate 2, and thus forming a jack support part 5 having a substantially horizontal lower surface; and surrounding a periphery of the jack support part 5 with a plurality of H-shaped steel materials 10, 11 in a headband shape.
【課題】 躯体に削孔を形成して、後施工アンカーを打設する必要がなく、躯体の強度の低下を防止することができ、事前鉄筋探査試験や、引張り試験、打設長確認試験などの各種鉄筋探査試験を行う必要がない仮受けジャッキ固定構造を提供する。【解決手段】 仮受けジャッキ固定構造は、仮受けジャッキ1の上部に底板2が配置され、高架橋6のハンチ部7と底板2の間に、無収縮モルタル3が充填されて、下面が略水平のジャッキ支持部5が形成され、ジャッキ支持部5の周囲が複数のH型鋼材10、11により、鉢巻状に囲まれることによって形成されている。【選択図】 図3
TEMPORARILY RECEIVING JACK FIXATION STRUCTURE
PROBLEM TO BE SOLVED: To provide a temporarily receiving jack fixation structure that eliminates the need to drill a skeleton and then install a post-construction anchor and thereby prevents the skeleton from deteriorating in strength, and requires none of various reinforcing bar survey tests such as a previous reinforcing bar survey test, a tension test, and an installation length confirmation test.SOLUTION: A temporarily receiving jack fixation structure is formed by: arranging a bottom plate 2 on a temporarily receiving jack 1; charging shrinkage-compensating mortar 3 between a haunch part 7 of a viaduct 6 and the bottom plate 2, and thus forming a jack support part 5 having a substantially horizontal lower surface; and surrounding a periphery of the jack support part 5 with a plurality of H-shaped steel materials 10, 11 in a headband shape.
【課題】 躯体に削孔を形成して、後施工アンカーを打設する必要がなく、躯体の強度の低下を防止することができ、事前鉄筋探査試験や、引張り試験、打設長確認試験などの各種鉄筋探査試験を行う必要がない仮受けジャッキ固定構造を提供する。【解決手段】 仮受けジャッキ固定構造は、仮受けジャッキ1の上部に底板2が配置され、高架橋6のハンチ部7と底板2の間に、無収縮モルタル3が充填されて、下面が略水平のジャッキ支持部5が形成され、ジャッキ支持部5の周囲が複数のH型鋼材10、11により、鉢巻状に囲まれることによって形成されている。【選択図】 図3
TEMPORARILY RECEIVING JACK FIXATION STRUCTURE
仮受けジャッキ固定構造
UCHIZONO MASAHITO (Autor:in) / KIBE KEISUKE (Autor:in) / KOBAYASHI TOSHIHIKO (Autor:in) / UCHIDA TAKASHI (Autor:in)
12.11.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY FIXATION SUBSTRATE AND METHOD FOR MANUFACTURING TEMPORARILY FIXED SUBSTRATE
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|JACK DEVICE FOR UNDERGROUND STRUCTURE LID RECEIVING FRAME
Europäisches Patentamt | 2017
|