PLANT MONITORING CONTROL SYSTEM
PROBLEM TO BE SOLVED: To provide a plant monitoring control system that controls a drainage pump in a downstream drainage pump site in response to demand warning generation in an upstream drainage pump site.SOLUTION: A telemeter master station 4 acquires outputs of a watt-hour meter 9 and a water level gauge 8 which measures the water level in a water storage tank 10 through respective telemeter slave stations 5 installed in a plurality of pump sites 6. An arithmetic part 4b computes an integral power consumption in a predetermined period. When it is predicted that the integral power consumption exceeds a contract power consumption stored in a storage part 4d of a telemeter master station 4, a demand warning is generated for a central monitoring device 2, a pump site 6 located downstream from the pump site 6 where the demand warning is generated is specified according to position relation information on respective pump sites 6 stored in the storage part 4d, and a command is sent to actuate a drainage pump 7 installed in the pump site 6 located downstream.
【課題】下流側の排水ポンプ場における排水ポンプを、上流の排水ポンプ場におけるデマンド警報発生に基づいて制御するプラント監視制御システムを得る。【解決手段】テレメータ親局4は、複数のポンプ場6に設置された各テレメータ子局5を介して電力量計9と貯水槽10の水位を計測する水位計8との出力を取得するように構成され、演算部4bにより所定期間の積算電力量を演算し、この積算電力量が、テレメータ親局4の保存部4dに保存している契約電力量を超えると予測した場合には、デマンド警報を中央監視装置2に対して発報するとともに、保存部4dに保存された各ポンプ場6の位置関係情報により、デマンド警報を発報したポンプ場6の下流に位置するポンプ場6を特定して、その下流に位置するポンプ場6に設置された排水ポンプ7を起動させるように指令する。【選択図】図1
PLANT MONITORING CONTROL SYSTEM
PROBLEM TO BE SOLVED: To provide a plant monitoring control system that controls a drainage pump in a downstream drainage pump site in response to demand warning generation in an upstream drainage pump site.SOLUTION: A telemeter master station 4 acquires outputs of a watt-hour meter 9 and a water level gauge 8 which measures the water level in a water storage tank 10 through respective telemeter slave stations 5 installed in a plurality of pump sites 6. An arithmetic part 4b computes an integral power consumption in a predetermined period. When it is predicted that the integral power consumption exceeds a contract power consumption stored in a storage part 4d of a telemeter master station 4, a demand warning is generated for a central monitoring device 2, a pump site 6 located downstream from the pump site 6 where the demand warning is generated is specified according to position relation information on respective pump sites 6 stored in the storage part 4d, and a command is sent to actuate a drainage pump 7 installed in the pump site 6 located downstream.
【課題】下流側の排水ポンプ場における排水ポンプを、上流の排水ポンプ場におけるデマンド警報発生に基づいて制御するプラント監視制御システムを得る。【解決手段】テレメータ親局4は、複数のポンプ場6に設置された各テレメータ子局5を介して電力量計9と貯水槽10の水位を計測する水位計8との出力を取得するように構成され、演算部4bにより所定期間の積算電力量を演算し、この積算電力量が、テレメータ親局4の保存部4dに保存している契約電力量を超えると予測した場合には、デマンド警報を中央監視装置2に対して発報するとともに、保存部4dに保存された各ポンプ場6の位置関係情報により、デマンド警報を発報したポンプ場6の下流に位置するポンプ場6を特定して、その下流に位置するポンプ場6に設置された排水ポンプ7を起動させるように指令する。【選択図】図1
PLANT MONITORING CONTROL SYSTEM
プラント監視制御システム
YOSHIMOTO AKIRA (Autor:in) / HARAMURA KAZUHIRO (Autor:in)
24.11.2015
Patent
Elektronische Ressource
Japanisch
Plant monitoring and environmental control system for the Lee Tunnel, Cork
British Library Conference Proceedings | 1999
|Electronical monitoring system for conveying plant
British Library Online Contents | 1996
MONITORING AND CONTROL - Penstock protection system at the Cedegolo plant in Italy
Online Contents | 1998
|On-Line Corrosion Monitoring for Process Plant Control
British Library Online Contents | 1994
|