Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
MOUNTING STRUCTURE AND MOUNTING METHOD
PROBLEM TO BE SOLVED: To provide a mounting structure of a seismic isolator to an intermediate layer of a building capable of improving the workability.SOLUTION: The mounting structure for mounting a seismic isolator to an intermediate layer of a building includes: a lower layer side beam-column connection part which is fixed to the seismic isolator; and an upper layer side beam-column connection part which is fixed to the seismic isolator. The lower part of the lower floor side beam-column connection part is constituted of a first pre-cast (PCa) member, and the lower part of the upper floor side beam-column connection part is constituted of a second PCa member. Each of the first and second PCa members includes reinforcing-bars embedded as the reinforcement bars of the beam-column connection part.
【課題】建物の中間層への免震装置の取り付けにあたり、その施工性を向上すること。【解決手段】建物の中間層に免震装置を取り付ける取付構造であって、前記免震装置と固定される下層側の柱梁接合部と、前記免震装置と固定される上層側の柱梁接合部と、を備え、前記下層側の柱梁接合部の下部は、第一のPCa部材で構成され、前記上層側の柱梁接合部の下部は、第二のPCa部材で構成され、前記第一及び第二のPCa部材は、それぞれ、前記柱梁接合部の補強筋を構成する鉄筋が植設されている。【選択図】図1
MOUNTING STRUCTURE AND MOUNTING METHOD
PROBLEM TO BE SOLVED: To provide a mounting structure of a seismic isolator to an intermediate layer of a building capable of improving the workability.SOLUTION: The mounting structure for mounting a seismic isolator to an intermediate layer of a building includes: a lower layer side beam-column connection part which is fixed to the seismic isolator; and an upper layer side beam-column connection part which is fixed to the seismic isolator. The lower part of the lower floor side beam-column connection part is constituted of a first pre-cast (PCa) member, and the lower part of the upper floor side beam-column connection part is constituted of a second PCa member. Each of the first and second PCa members includes reinforcing-bars embedded as the reinforcement bars of the beam-column connection part.
【課題】建物の中間層への免震装置の取り付けにあたり、その施工性を向上すること。【解決手段】建物の中間層に免震装置を取り付ける取付構造であって、前記免震装置と固定される下層側の柱梁接合部と、前記免震装置と固定される上層側の柱梁接合部と、を備え、前記下層側の柱梁接合部の下部は、第一のPCa部材で構成され、前記上層側の柱梁接合部の下部は、第二のPCa部材で構成され、前記第一及び第二のPCa部材は、それぞれ、前記柱梁接合部の補強筋を構成する鉄筋が植設されている。【選択図】図1
MOUNTING STRUCTURE AND MOUNTING METHOD
取付構造及び取付工法
AONO HIDENORI (Autor:in) / MIYATA TETSUJI (Autor:in) / MORI YASUHIRO (Autor:in) / HOSHI TAKAO (Autor:in) / YOSHITAKE MUNEHIKO (Autor:in) / INADA HIROBUMI (Autor:in)
07.01.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
PANEL MOUNTING BRACKET, PANEL MOUNTING STRUCTURE AND PANEL MOUNTING METHOD
Europäisches Patentamt | 2022
|Mounting structure of wooden stair treads and mounting method of mounting structure
Europäisches Patentamt | 2020
|Mounting structure of wall leveling member and mounting method of mounting structure
Europäisches Patentamt | 2020
|Mounting structure of drainage threshold stone and mounting method of mounting structure
Europäisches Patentamt | 2020
|