DOWELS PILE AND CONSTRUCTION METHOD OF DOWELS PILE
PROBLEM TO BE SOLVED: To provide a dowels pile superior in load bearing ability against internal force.SOLUTION: The dowels pile has plural holes formed in the side wall of a pipe member. Plural rod-like members are disposed penetrating through the holes protruding inward the pipe member. The inside of the pipe member with the rod-like members disposed is filled with a time-curable material. The dowels pile is filled with the time-curable material inside the pipe member so that the time-curable material enters into the holes integrally with the rod-like members. The dowels pile is formed with holes in the entire face of the side wall of the pipe member at predetermined intervals. With this arrangement, the dowels pile shares an internal force which is generated by an external force applied to the dowels pile 1, and concrete member is prevented from being broken resulting in an improved durability.
【課題】 内力に対する耐力の優れたジベル杭を提供する。【解決手段】 ジベル杭は、管材の側壁に複数設けられる孔部に、孔部を貫通し管材の内部に突出して棒状部材を配置し、棒状部材を配置された管材の内部に経時硬化性部材を充填される。ジベル杭は、孔部の内部に入り込み、かつ、棒状部材に一体となるよう管材の内部に経時硬化性部材を充填される。また、ジベル杭は、管材の側壁の全面にわたって既定の間隔で孔部を設けられる。このような構成により、ジベル杭は、ジベル杭1に加えられる外力により発生する内力を分担することで、コンクリート部材の破壊を防止することができるため、耐久性の向上が期待できる。【選択図】図1
DOWELS PILE AND CONSTRUCTION METHOD OF DOWELS PILE
PROBLEM TO BE SOLVED: To provide a dowels pile superior in load bearing ability against internal force.SOLUTION: The dowels pile has plural holes formed in the side wall of a pipe member. Plural rod-like members are disposed penetrating through the holes protruding inward the pipe member. The inside of the pipe member with the rod-like members disposed is filled with a time-curable material. The dowels pile is filled with the time-curable material inside the pipe member so that the time-curable material enters into the holes integrally with the rod-like members. The dowels pile is formed with holes in the entire face of the side wall of the pipe member at predetermined intervals. With this arrangement, the dowels pile shares an internal force which is generated by an external force applied to the dowels pile 1, and concrete member is prevented from being broken resulting in an improved durability.
【課題】 内力に対する耐力の優れたジベル杭を提供する。【解決手段】 ジベル杭は、管材の側壁に複数設けられる孔部に、孔部を貫通し管材の内部に突出して棒状部材を配置し、棒状部材を配置された管材の内部に経時硬化性部材を充填される。ジベル杭は、孔部の内部に入り込み、かつ、棒状部材に一体となるよう管材の内部に経時硬化性部材を充填される。また、ジベル杭は、管材の側壁の全面にわたって既定の間隔で孔部を設けられる。このような構成により、ジベル杭は、ジベル杭1に加えられる外力により発生する内力を分担することで、コンクリート部材の破壊を防止することができるため、耐久性の向上が期待できる。【選択図】図1
DOWELS PILE AND CONSTRUCTION METHOD OF DOWELS PILE
ジベル杭、及び、ジベル杭の施工方法
SAITO FUMIHIRO (Autor:in)
07.01.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Wiley | 2016
|Concrete 'Dowels' anchor cliff
Engineering Index Backfile | 1960
|Online Contents | 1995
|Construction using bundled tube and threaded stepped dowels
Europäisches Patentamt | 2023
|CONSTRUCTION USING BUNDLED TUBE AND THREADED STEPPED DOWELS
Europäisches Patentamt | 2022
|