PROBLEM TO BE SOLVED: To provide a horizontal movement restraining method of an existing building capable of securing horizontal holding bearing force, by inexpensively restraining the horizontal movement of the building in a construction period, without reducing working efficiency, even when the outer periphery of the existing building canot be sufficiently excavated.SOLUTION: A horizontal movement restraining method comprises Steps S1 and S2 for forming an excavation space 63, Steps S3 and S4 for constructing a mat slab 21 on a bottom surface of this excavation space 63 and a Step S5 of providing a temporary receiving column 70 on this mat slab 21 and joining a horizontal movement restraining material 80 for restraining the relative movement to the mat slab 21 of the existing building 1, to the respective mat slab 21 and 1 existing building by anchor bolts 821 and 845 between the mat slab 21 and the existing building 1.
【課題】既存建物の外周を十分に掘削できない場合であっても、作業効率を低下させることなく、低コストで、工事期間中における建物の水平移動を拘束して、水平保有耐力を確保できる既存建物の水平移動拘束方法を提供すること。【解決手段】水平移動拘束方法は、掘削空間63を形成するステップS1、S2と、この掘削空間63の底面上にマットスラブ21を構築するステップS3、S4と、このマットスラブ21の上に仮受支柱70を設けるとともに、マットスラブ21と既存建物1との間に既存建物1のマットスラブ21に対する相対移動を拘束する水平移動拘束材80を、マットスラブ21および既存建物1のそれぞれにアンカーボルト821、845で接合するステップS5と、を備える。【選択図】図3
PROBLEM TO BE SOLVED: To provide a horizontal movement restraining method of an existing building capable of securing horizontal holding bearing force, by inexpensively restraining the horizontal movement of the building in a construction period, without reducing working efficiency, even when the outer periphery of the existing building canot be sufficiently excavated.SOLUTION: A horizontal movement restraining method comprises Steps S1 and S2 for forming an excavation space 63, Steps S3 and S4 for constructing a mat slab 21 on a bottom surface of this excavation space 63 and a Step S5 of providing a temporary receiving column 70 on this mat slab 21 and joining a horizontal movement restraining material 80 for restraining the relative movement to the mat slab 21 of the existing building 1, to the respective mat slab 21 and 1 existing building by anchor bolts 821 and 845 between the mat slab 21 and the existing building 1.
【課題】既存建物の外周を十分に掘削できない場合であっても、作業効率を低下させることなく、低コストで、工事期間中における建物の水平移動を拘束して、水平保有耐力を確保できる既存建物の水平移動拘束方法を提供すること。【解決手段】水平移動拘束方法は、掘削空間63を形成するステップS1、S2と、この掘削空間63の底面上にマットスラブ21を構築するステップS3、S4と、このマットスラブ21の上に仮受支柱70を設けるとともに、マットスラブ21と既存建物1との間に既存建物1のマットスラブ21に対する相対移動を拘束する水平移動拘束材80を、マットスラブ21および既存建物1のそれぞれにアンカーボルト821、845で接合するステップS5と、を備える。【選択図】図3
HORIZONTAL MOVEMENT RESTRAINING METHOD
水平移動拘束方法
OGIWARA KOJI (Autor:in)
21.01.2016
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2017
|