BUILDING EXTENSION STRUCTURE AND EXTENSION BUILDING CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide building extension structure and an extension building construction method, enabling a construction period to be shortened.SOLUTION: Extension structure 1 for constructing an extension building 4 above an existing building 11, comprises: a stand 2 which is arranged on the existing building 11 and is supported from below with at least one of an outer wall (a wall) 13 and a column of the existing building 11 and on which the extension building 4 is constructed; and a bracket 3 fixed to the stand 2 and fixed so as to be opposed in the horizontal direction to at least the one of the outer wall 13 and the column of the existing building 11. A mortar grout (a grout material) 5 is filled between the stand 2 and the existing building 11 and between the bracket 3 and the existing building 11.SELECTED DRAWING: Figure 1
【課題】工期を短縮できる増築構造および増築建物の構築方法を提供する。【解決手段】既存建物11の上部に増築建物4を構築する増築構造11において、既存建物11の上部に配置されるとともに、既存建物11の外壁(壁)13および柱の少なくとも一方に下方から支持され、上部に増築建物4が構築される架台2と、架台2に固定されるとともに、既存建物11の外壁13および柱の少なくとも一方と水平方向に対向するように固定されるブラケット3と、を備え、架台2と既存建物11との間、および前記ブラケット3と既存建物11との間には、モルタルグラウト(グラウト材)5が充填されている。【選択図】図1
BUILDING EXTENSION STRUCTURE AND EXTENSION BUILDING CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide building extension structure and an extension building construction method, enabling a construction period to be shortened.SOLUTION: Extension structure 1 for constructing an extension building 4 above an existing building 11, comprises: a stand 2 which is arranged on the existing building 11 and is supported from below with at least one of an outer wall (a wall) 13 and a column of the existing building 11 and on which the extension building 4 is constructed; and a bracket 3 fixed to the stand 2 and fixed so as to be opposed in the horizontal direction to at least the one of the outer wall 13 and the column of the existing building 11. A mortar grout (a grout material) 5 is filled between the stand 2 and the existing building 11 and between the bracket 3 and the existing building 11.SELECTED DRAWING: Figure 1
【課題】工期を短縮できる増築構造および増築建物の構築方法を提供する。【解決手段】既存建物11の上部に増築建物4を構築する増築構造11において、既存建物11の上部に配置されるとともに、既存建物11の外壁(壁)13および柱の少なくとも一方に下方から支持され、上部に増築建物4が構築される架台2と、架台2に固定されるとともに、既存建物11の外壁13および柱の少なくとも一方と水平方向に対向するように固定されるブラケット3と、を備え、架台2と既存建物11との間、および前記ブラケット3と既存建物11との間には、モルタルグラウト(グラウト材)5が充填されている。【選択図】図1
BUILDING EXTENSION STRUCTURE AND EXTENSION BUILDING CONSTRUCTION METHOD
増築構造および増築建物の構築方法
TSUBOTA MASAYUKI (Autor:in) / SUENAGA KAZUYA (Autor:in) / ABE MASAHIRO (Autor:in) / KINOSHITA HIDEO (Autor:in)
04.04.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Basement extension building junction structure waterproof structure and construction method
Europäisches Patentamt | 2021
|Construction of the whitehall building extension
Engineering Index Backfile | 1910
Extension type construction feeding device for building construction
Europäisches Patentamt | 2021
|