Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ANCHOR BOLT INSTALLATION METHOD
PROBLEM TO BE SOLVED: To easily position a fixation object to an existing structure when fixing the fixation object to the existing structure by using an anchor bolt of post-construction.SOLUTION: A filler is injected into a space 75 partitioned by a web surface 55w of a beam member 55 of a template unit 51a for temporarily fixing a plurality of anchor bolts 60, an inner surface of a through-hole 71 of a form member 70 and an inner surface of a hole 61 for inserting a burying expected part 60a of the anchor bolts 60. After hardening the filler, a temporary fixation is released, and the template unit 51a and the form member 70 are separated from a structure. Thus, among the filler hardened around the respective anchor bolts 60, a part of abutting on the web surface 55w becomes a contact surface (an anchor base surface 88) with a fixation object.SELECTED DRAWING: Figure 10
【課題】後施工のアンカーボルトを用いて既設の構造物に被固定物を固定する際に、既設の構造物に対する被固定物の位置決めを容易にする。【解決手段】複数本のアンカーボルト60が仮固定されたテンプレートユニット51aの梁部材55のウェブ面55wと、型枠部材70の貫通孔71の内面と、アンカーボルト60の埋設予定部分60aが挿入された孔61の内面とによって区画される空間75内に充填材が注入される。また、充填材の硬化後に、前記仮固定が解除されて、テンプレートユニット51a及び型枠部材70が構造物から分離される。これにより、各アンカーボルト60の周囲にて硬化した充填材のうちウェブ面55wに当接していた部分が被固定物との接触面(アンカー基面88)になる。【選択図】図10
ANCHOR BOLT INSTALLATION METHOD
PROBLEM TO BE SOLVED: To easily position a fixation object to an existing structure when fixing the fixation object to the existing structure by using an anchor bolt of post-construction.SOLUTION: A filler is injected into a space 75 partitioned by a web surface 55w of a beam member 55 of a template unit 51a for temporarily fixing a plurality of anchor bolts 60, an inner surface of a through-hole 71 of a form member 70 and an inner surface of a hole 61 for inserting a burying expected part 60a of the anchor bolts 60. After hardening the filler, a temporary fixation is released, and the template unit 51a and the form member 70 are separated from a structure. Thus, among the filler hardened around the respective anchor bolts 60, a part of abutting on the web surface 55w becomes a contact surface (an anchor base surface 88) with a fixation object.SELECTED DRAWING: Figure 10
【課題】後施工のアンカーボルトを用いて既設の構造物に被固定物を固定する際に、既設の構造物に対する被固定物の位置決めを容易にする。【解決手段】複数本のアンカーボルト60が仮固定されたテンプレートユニット51aの梁部材55のウェブ面55wと、型枠部材70の貫通孔71の内面と、アンカーボルト60の埋設予定部分60aが挿入された孔61の内面とによって区画される空間75内に充填材が注入される。また、充填材の硬化後に、前記仮固定が解除されて、テンプレートユニット51a及び型枠部材70が構造物から分離される。これにより、各アンカーボルト60の周囲にて硬化した充填材のうちウェブ面55wに当接していた部分が被固定物との接触面(アンカー基面88)になる。【選択図】図10
ANCHOR BOLT INSTALLATION METHOD
アンカーボルトの設置方法
OGAWA YUICHIRO (Autor:in) / KAGAMI YOSHIHIRO (Autor:in) / TSUBAKI HARUHIKO (Autor:in) / SHINDO TAKUYA (Autor:in) / WASHINO DAIYA (Autor:in) / SHIBUYA MASANOBU (Autor:in) / ONO TOSHIHISA (Autor:in)
04.04.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
AUXILIARY TOOL FOR ANCHOR BOLT, ANCHOR BOLT SET, AND INSTALLATION METHOD FOR ANCHOR BOLT
Europäisches Patentamt | 2016
|VERTICAL INSTALLATION TOOL FOR ANCHOR BOLT AND VERTICAL INSTALLATION METHOD FOR ANCHOR BOLT
Europäisches Patentamt | 2021
|ANCHOR BOLT FOR ADHESIVE ANCHOR, ADHESIVE ANCHOR, AND ADHESIVE ANCHOR INSTALLATION METHOD
Europäisches Patentamt | 2019
|ANCHOR BOLT FOR ADHESIVE ANCHOR, ADHESIVE ANCHOR, AND ADHESIVE ANCHOR INSTALLATION METHOD
Europäisches Patentamt | 2025
|