Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ROCK LUMP FIXING STRUCTURE AND ROCK LUMP FIXING METHOD
PROBLEM TO BE SOLVED: To provide a rock lump fixing structure and a rock lump fixing method capable of fixing one or a plurality of rock lumps to a slope face with excellent stability, while reducing a burden on an operator in material transport, by reducing materials transported onto the slope face.SOLUTION: A cement-based material layer 11 is provided so that at least the lower part of an exposed part of a rock lump 2 is buried in an area surrounding one or a plurality of rock lumps 2 existing on a slope face 1, and a rock lump adhesive layer 12 for adhering the rock lump 2 and the cement-based material layer 11 is provided on a boundary surface between the rock lump 2 and the cement-based material layer 11. The cement-based material layer 11 is also fixed to a base rock 3 by anchor means 13.SELECTED DRAWING: Figure 1
【課題】斜面上へ輸送する資材を少なくして、資材輸送に対する作業者の負担を軽減でき、1乃至複数の岩塊を安定性良く斜面に固定可能な岩塊固定構造及び岩塊固定方法を提供する。【解決手段】斜面1上に存在する1乃至複数の岩塊2を取り囲む領域に、岩塊2の露出部分の少なくとも下部が埋設されるようにセメント系材料層11を設け、岩塊2とセメント系材料層11の境界面に、岩塊2とセメント系材料層11とを接着する岩塊接着剤層12を設けた。また、セメント系材料層11をアンカー手段13で岩盤3に固定した。【選択図】図1
ROCK LUMP FIXING STRUCTURE AND ROCK LUMP FIXING METHOD
PROBLEM TO BE SOLVED: To provide a rock lump fixing structure and a rock lump fixing method capable of fixing one or a plurality of rock lumps to a slope face with excellent stability, while reducing a burden on an operator in material transport, by reducing materials transported onto the slope face.SOLUTION: A cement-based material layer 11 is provided so that at least the lower part of an exposed part of a rock lump 2 is buried in an area surrounding one or a plurality of rock lumps 2 existing on a slope face 1, and a rock lump adhesive layer 12 for adhering the rock lump 2 and the cement-based material layer 11 is provided on a boundary surface between the rock lump 2 and the cement-based material layer 11. The cement-based material layer 11 is also fixed to a base rock 3 by anchor means 13.SELECTED DRAWING: Figure 1
【課題】斜面上へ輸送する資材を少なくして、資材輸送に対する作業者の負担を軽減でき、1乃至複数の岩塊を安定性良く斜面に固定可能な岩塊固定構造及び岩塊固定方法を提供する。【解決手段】斜面1上に存在する1乃至複数の岩塊2を取り囲む領域に、岩塊2の露出部分の少なくとも下部が埋設されるようにセメント系材料層11を設け、岩塊2とセメント系材料層11の境界面に、岩塊2とセメント系材料層11とを接着する岩塊接着剤層12を設けた。また、セメント系材料層11をアンカー手段13で岩盤3に固定した。【選択図】図1
ROCK LUMP FIXING STRUCTURE AND ROCK LUMP FIXING METHOD
岩塊固定構造及び岩塊固定方法
SAKAI KENJI (Autor:in) / ENDO JUNICHI (Autor:in) / FUKAZAWA KEISUKE (Autor:in) / MOCHIZUKI JUN (Autor:in)
04.04.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
British Library Online Contents | 1999
|Online Contents | 1999
|Engineering Index Backfile | 1930