TEMPORARY EARTH RETAINING STRUCTURE AND TEMPORARY EARTH RETAINING METHOD
PROBLEM TO BE SOLVED: To prevent collapse of sediment, and to simplify its construction.SOLUTION: A maximum value of a vertical column is determined by a constructing distance. Two stages or more of connection receiving parts for receiving its insertion to insertion from the upper direction, are arranged in this vertical column. An insertion engaging part on both ends of a horizontal column of making a pair of two pieces, is inserted into the connection receiving parts existing in the same height of the oppositely arranging vertical column. A frame body composed of the vertical column and the horizontal column is formed of four or more of vertical columns and two pairs or more of horizontal columns. Since a steel sheet pile guide having a width and a thickness for inserting a steel sheet pile only in the vertical direction is provided on the one or four-sides on the outside of a rectangular space in the horizontal direction enclosed by two pairs of horizontal columns in two or more of horizontal columns, the steel sheet pile can be installed by inserting the steel sheet pile in the vertical direction into the two or more of horizontal columns. At this time, since the horizontal column functions as a wale, sediment of an external part of the steel sheet pile does not enter the inside.SELECTED DRAWING: Figure 1
【課題】土砂の崩壊を防ぐことができ、かつ、その施工が簡単なこと。【解決手段】縦支柱の最大値は施工する距離によって決定される。この縦支柱には、上方向からの挿入に対してその挿入を受ける2段以上の接続受部が配設されている。対向配置する縦支柱の同一高さにある接続受部に対して、2個を対とする横支柱の両端の挿入係合部が挿入される。4本以上の縦支柱と2対以上の横支柱によって縦支柱と横支柱からなる枠体が形成される。横支柱の2本以上には、2対の横支柱で囲まれた水平方向の矩形空間の外側の一方乃至四方に、鋼矢板を上下方向のみに通す幅及び厚みを有する鋼矢板ガイドが設けられているから、横支柱の2本以上に前記鋼矢板を上下方向に挿通し、前記鋼矢板を設置できる。このとき、横支柱は腹起しとして機能するから、鋼矢板の外部の土砂が内部に入り込むことがない。【選択図】図1
TEMPORARY EARTH RETAINING STRUCTURE AND TEMPORARY EARTH RETAINING METHOD
PROBLEM TO BE SOLVED: To prevent collapse of sediment, and to simplify its construction.SOLUTION: A maximum value of a vertical column is determined by a constructing distance. Two stages or more of connection receiving parts for receiving its insertion to insertion from the upper direction, are arranged in this vertical column. An insertion engaging part on both ends of a horizontal column of making a pair of two pieces, is inserted into the connection receiving parts existing in the same height of the oppositely arranging vertical column. A frame body composed of the vertical column and the horizontal column is formed of four or more of vertical columns and two pairs or more of horizontal columns. Since a steel sheet pile guide having a width and a thickness for inserting a steel sheet pile only in the vertical direction is provided on the one or four-sides on the outside of a rectangular space in the horizontal direction enclosed by two pairs of horizontal columns in two or more of horizontal columns, the steel sheet pile can be installed by inserting the steel sheet pile in the vertical direction into the two or more of horizontal columns. At this time, since the horizontal column functions as a wale, sediment of an external part of the steel sheet pile does not enter the inside.SELECTED DRAWING: Figure 1
【課題】土砂の崩壊を防ぐことができ、かつ、その施工が簡単なこと。【解決手段】縦支柱の最大値は施工する距離によって決定される。この縦支柱には、上方向からの挿入に対してその挿入を受ける2段以上の接続受部が配設されている。対向配置する縦支柱の同一高さにある接続受部に対して、2個を対とする横支柱の両端の挿入係合部が挿入される。4本以上の縦支柱と2対以上の横支柱によって縦支柱と横支柱からなる枠体が形成される。横支柱の2本以上には、2対の横支柱で囲まれた水平方向の矩形空間の外側の一方乃至四方に、鋼矢板を上下方向のみに通す幅及び厚みを有する鋼矢板ガイドが設けられているから、横支柱の2本以上に前記鋼矢板を上下方向に挿通し、前記鋼矢板を設置できる。このとき、横支柱は腹起しとして機能するから、鋼矢板の外部の土砂が内部に入り込むことがない。【選択図】図1
TEMPORARY EARTH RETAINING STRUCTURE AND TEMPORARY EARTH RETAINING METHOD
仮設山留構造体及び仮設山留方法
KONDO TATSUYA (Autor:in)
21.04.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
TEMPORARY EARTH RETAINING DEVICE AND CONSTRUCTION METHOD FOR EARTH RETAINING STRUCTURE