Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SUBSTRUCTURE
PROBLEM TO BE SOLVED: To provide a substructure in which a vertical load applied on a precast base member constituting at least a lower part side of the base is transmitted to a pile head effectively.SOLUTION: A pile head insertion hole 122 where a pile head 42 of a pile 40 is inserted and penetrated in the vertical direction is formed in a lower side precast base member 120. A sliced circular slice steel pipe 130 is inserted in the pile head insertion hole 122. A flat plate 132 is joined in an inner surface and an outer surface of the circular slice steel pipe 130. A lower end of a pile rebar 110 is joined in the upper part of the outer surface of the circular slice steel pipe 130. A upper end surface 42U of the pile head 42 is inserted so as to be positioned at the side lower than an upper surface 120U of the lower side precast base member 120. A flat plate 44 is joined in a circumferential wall 42A of the pile head 42 of the pile 40.SELECTED DRAWING: Figure 1
【課題】基礎部の少なくとも下部側を構成するプレキャスト基礎部材にかかる鉛直荷重を杭頭に効果的に伝達させる。【解決手段】下側プレキャスト基礎部材120には、杭40の杭頭42が挿入される上下方向に貫通した杭頭挿入孔122が形成されている。杭頭挿入孔122には輪切りされた輪切鋼管130が挿入されている。輪切鋼管130の内面及び外面には、フラットプレート132が接合されている。輪切鋼管130の外面の上部には、杭鉄筋110の下端部が接合されている。杭頭42の上端面42Uは、下側プレキャスト基礎部材120の上面120Uよりも下側に位置するように挿入されている。杭40の杭頭42の周壁42Aには、フラットプレート44が接合されている。【選択図】図1
SUBSTRUCTURE
PROBLEM TO BE SOLVED: To provide a substructure in which a vertical load applied on a precast base member constituting at least a lower part side of the base is transmitted to a pile head effectively.SOLUTION: A pile head insertion hole 122 where a pile head 42 of a pile 40 is inserted and penetrated in the vertical direction is formed in a lower side precast base member 120. A sliced circular slice steel pipe 130 is inserted in the pile head insertion hole 122. A flat plate 132 is joined in an inner surface and an outer surface of the circular slice steel pipe 130. A lower end of a pile rebar 110 is joined in the upper part of the outer surface of the circular slice steel pipe 130. A upper end surface 42U of the pile head 42 is inserted so as to be positioned at the side lower than an upper surface 120U of the lower side precast base member 120. A flat plate 44 is joined in a circumferential wall 42A of the pile head 42 of the pile 40.SELECTED DRAWING: Figure 1
【課題】基礎部の少なくとも下部側を構成するプレキャスト基礎部材にかかる鉛直荷重を杭頭に効果的に伝達させる。【解決手段】下側プレキャスト基礎部材120には、杭40の杭頭42が挿入される上下方向に貫通した杭頭挿入孔122が形成されている。杭頭挿入孔122には輪切りされた輪切鋼管130が挿入されている。輪切鋼管130の内面及び外面には、フラットプレート132が接合されている。輪切鋼管130の外面の上部には、杭鉄筋110の下端部が接合されている。杭頭42の上端面42Uは、下側プレキャスト基礎部材120の上面120Uよりも下側に位置するように挿入されている。杭40の杭頭42の周壁42Aには、フラットプレート44が接合されている。【選択図】図1
SUBSTRUCTURE
基礎構造
INOUE TOMITA (Autor:in) / WATANABE HIDEYUKI (Autor:in) / ISHIKAWA TOMOAKI (Autor:in) / TAI TORU (Autor:in) / HONDA TAKESHI (Autor:in) / TANIGAWA TOMOHIRO (Autor:in) / ISHIKAWA YUJI (Autor:in) / FUKUHARA TAKESHI (Autor:in) / WADA KAZUHIKO (Autor:in) / YOSHIDA KOICHI (Autor:in)
09.05.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Wiley | 2019
|Wiley | 2012
|Substructure identification for shear structures I: Substructure identification method
Wiley | 2013
|Substructure identification for shear structures II: Controlled substructure identification
Wiley | 2013
|