FENCE CONSTRUCTION METHOD ON INCLINED SURFACE
PROBLEM TO BE SOLVED: To provide a highly safe fence construction method capable of improving constructability and workability on an inclined surface.SOLUTION: A fence construction method comprises the steps of: laying two monorails 5, 7 along an inclined surface 1; disposing multiple scaffold stages 2a, 2b, 2c...2n in a stair condition along the monorail 5; carrying out the task ahead of a task at a lower scaffold stage among the scaffold stages adjacent to each other at an upper scaffold stage; running a first carriage 9, which is mounted with a material required for a fence construction at one scaffold stage, on the monorail 7; hoisting the material mounted on the first carriage 9 by a crane 12 mounted on a second carriage 10 located on the monorail 5; and supplying the material to the scaffold stage that requires the material.SELECTED DRAWING: Figure 2
【課題】 傾斜面における施工性、作業性を向上させることができ、安全性の高いフェンス構築方法を提供する。【解決手段】 フェンス構築方法は、傾斜面1に沿って、2つのモノレール軌条5、7を敷設し、モノレール軌条5に沿って、複数の足場ステージ2a、2b、2c・・・2nを階段状に設け、互いに隣り合った足場ステージのうち、上方の足場ステージにおいて、下方の足場ステージにおける作業の一つ先の作業を行うようにし、モノレール軌条7上に、一つの足場ステージにおけるフェンス構築工事に必要な資材を搭載した第一の台車9を走らせ、モノレール軌条5上に位置している第二の台車10に搭載されたクレーン12によって、第一の台車9に搭載されている資材を吊り上げて、その資材を必要とする足場ステージに供給するように構成されている。【選択図】 図2
FENCE CONSTRUCTION METHOD ON INCLINED SURFACE
PROBLEM TO BE SOLVED: To provide a highly safe fence construction method capable of improving constructability and workability on an inclined surface.SOLUTION: A fence construction method comprises the steps of: laying two monorails 5, 7 along an inclined surface 1; disposing multiple scaffold stages 2a, 2b, 2c...2n in a stair condition along the monorail 5; carrying out the task ahead of a task at a lower scaffold stage among the scaffold stages adjacent to each other at an upper scaffold stage; running a first carriage 9, which is mounted with a material required for a fence construction at one scaffold stage, on the monorail 7; hoisting the material mounted on the first carriage 9 by a crane 12 mounted on a second carriage 10 located on the monorail 5; and supplying the material to the scaffold stage that requires the material.SELECTED DRAWING: Figure 2
【課題】 傾斜面における施工性、作業性を向上させることができ、安全性の高いフェンス構築方法を提供する。【解決手段】 フェンス構築方法は、傾斜面1に沿って、2つのモノレール軌条5、7を敷設し、モノレール軌条5に沿って、複数の足場ステージ2a、2b、2c・・・2nを階段状に設け、互いに隣り合った足場ステージのうち、上方の足場ステージにおいて、下方の足場ステージにおける作業の一つ先の作業を行うようにし、モノレール軌条7上に、一つの足場ステージにおけるフェンス構築工事に必要な資材を搭載した第一の台車9を走らせ、モノレール軌条5上に位置している第二の台車10に搭載されたクレーン12によって、第一の台車9に搭載されている資材を吊り上げて、その資材を必要とする足場ステージに供給するように構成されている。【選択図】 図2
FENCE CONSTRUCTION METHOD ON INCLINED SURFACE
傾斜面におけるフェンス構築方法
MORII SADAKAZU (Autor:in) / FUKUNAGA YOSHIHIRO (Autor:in) / SENGOKU TAKAHISA (Autor:in)
12.08.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES