Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
HORIZONTALLY INSTALLED STRUCTURE
PROBLEM TO BE SOLVED: To reduce costs while controlling decline in surface smoothness.SOLUTION: A horizontally installed structure is spanned between a first support part and a second support part separated from the first support part in a horizontal direction, the horizontally installed structure being exerted to a vertical load from above. The horizontally installed structure includes a concrete member connecting the first support part with the second support part while being curved upward, a steel member connecting the first and the second support parts while being curved downward, and a vertical connecting member that vertically connects the concrete member with the steel member.SELECTED DRAWING: Figure 2
【課題】平坦性の悪化を抑制しつつコストの低減を図る。【解決手段】第1の支持部と、前記第1の支持部から水平方向に離間した第2の支持部との間に架設され、上方から鉛直荷重を受ける横架構造体であって、前記第1の支持部と前記第2の支持部とを、上方に凸となるように湾曲して連結するコンクリート部材と、前記第1の支持部と前記第2の支持部とを、下方に凸となるように湾曲して連結する鋼材と、前記コンクリート部材と前記鋼材とを上下に連結する上下連結部材と、を備えた。【選択図】図2
HORIZONTALLY INSTALLED STRUCTURE
PROBLEM TO BE SOLVED: To reduce costs while controlling decline in surface smoothness.SOLUTION: A horizontally installed structure is spanned between a first support part and a second support part separated from the first support part in a horizontal direction, the horizontally installed structure being exerted to a vertical load from above. The horizontally installed structure includes a concrete member connecting the first support part with the second support part while being curved upward, a steel member connecting the first and the second support parts while being curved downward, and a vertical connecting member that vertically connects the concrete member with the steel member.SELECTED DRAWING: Figure 2
【課題】平坦性の悪化を抑制しつつコストの低減を図る。【解決手段】第1の支持部と、前記第1の支持部から水平方向に離間した第2の支持部との間に架設され、上方から鉛直荷重を受ける横架構造体であって、前記第1の支持部と前記第2の支持部とを、上方に凸となるように湾曲して連結するコンクリート部材と、前記第1の支持部と前記第2の支持部とを、下方に凸となるように湾曲して連結する鋼材と、前記コンクリート部材と前記鋼材とを上下に連結する上下連結部材と、を備えた。【選択図】図2
HORIZONTALLY INSTALLED STRUCTURE
横架構造体
TSUJI YASUHIKO (Autor:in) / TAKEUCHI HIROKO (Autor:in)
22.08.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Pullout Capacity of Horizontally Loaded Suction Anchor Installed in Silty Sand
Online Contents | 2016
|Pullout Capacity of Horizontally Loaded Suction Anchor Installed in Silty Sand
Taylor & Francis Verlag | 2016
|Pullout Capacity of Horizontally Loaded Suction Anchor Installed in Silty Sand
Online Contents | 2014
|