Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ANCHOR BOLT SETTING JIG AND ANCHOR BOLT CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an anchor bolt setting jig capable of fixing a base mold for forming a side face of a base part of a continuous foundation which has a base part and a rise-up portion without using a support member, and capable of precisely positioning an anchor bolt which is embedded in the base part.SOLUTION: An anchor bolt setting jig 1 has an anchor bolt position positioning member 2 with an anchor bolt position positioning hole 18 through which an anchor bolt 56 is inserted. One end of the anchor bolt position positioning member 2 is connected to the upper end of one base mold 61A for forming one side face of a base part 53, and the other end of which is engaged with the lower end of a rise-up mold 62A for forming the other side face of a rise-up portion 54 to prevent a relative movement in a foundation width direction.SELECTED DRAWING: Figure 1
【課題】 ベース部と立上り部とを有する連続型の基礎におけるベース部の側面を形成するベース型枠材を、サポート材を使用せずに固定することができ、かつベース部に埋め込まれるアンカーボルトを正確に位置決めできるアンカーボルト施工治具を提供する。【解決手段】 アンカーボルト施工治具1は、アンカーボルト56が挿通されるアンカーボルト位置決め孔18を有するアンカーボルト位置決め部材2を備える。このアンカーボルト位置決め部材62は、一端がベース部53の一方の側面を形成する一方のベース型枠材61Aの上端に結合され、他端が立上り部54の一方の側面を形成する一方の立上り型枠材62Aの下端に基礎幅方向に相対移動不能に係合する。【選択図】 図1
ANCHOR BOLT SETTING JIG AND ANCHOR BOLT CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an anchor bolt setting jig capable of fixing a base mold for forming a side face of a base part of a continuous foundation which has a base part and a rise-up portion without using a support member, and capable of precisely positioning an anchor bolt which is embedded in the base part.SOLUTION: An anchor bolt setting jig 1 has an anchor bolt position positioning member 2 with an anchor bolt position positioning hole 18 through which an anchor bolt 56 is inserted. One end of the anchor bolt position positioning member 2 is connected to the upper end of one base mold 61A for forming one side face of a base part 53, and the other end of which is engaged with the lower end of a rise-up mold 62A for forming the other side face of a rise-up portion 54 to prevent a relative movement in a foundation width direction.SELECTED DRAWING: Figure 1
【課題】 ベース部と立上り部とを有する連続型の基礎におけるベース部の側面を形成するベース型枠材を、サポート材を使用せずに固定することができ、かつベース部に埋め込まれるアンカーボルトを正確に位置決めできるアンカーボルト施工治具を提供する。【解決手段】 アンカーボルト施工治具1は、アンカーボルト56が挿通されるアンカーボルト位置決め孔18を有するアンカーボルト位置決め部材2を備える。このアンカーボルト位置決め部材62は、一端がベース部53の一方の側面を形成する一方のベース型枠材61Aの上端に結合され、他端が立上り部54の一方の側面を形成する一方の立上り型枠材62Aの下端に基礎幅方向に相対移動不能に係合する。【選択図】 図1
ANCHOR BOLT SETTING JIG AND ANCHOR BOLT CONSTRUCTION METHOD
アンカーボルト施工治具およびアンカーボルト施工方法
YOO DONG-YEON (Autor:in) / SUZUKI KINYA (Autor:in)
10.11.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ANCHOR BOLT SETTING JIG, AND ANCHOR BOLT SETTING METHOD
Europäisches Patentamt | 2024
|PRESTRESSED UNBONDED ANCHOR BOLT REBAR, ANCHOR BOLT, AND CONSTRUCTION METHOD
Europäisches Patentamt | 2022
|COMPOSITE ANCHOR BOLT AND CONSTRUCTION METHOD FOR THE ANCHOR BOLT
Europäisches Patentamt | 2015
|