CONSTRUCTION METHOD OF BEAM COUPLING STRUCTURE, AND BEAM MEMBER
PROBLEM TO BE SOLVED: To shorten a construction period and save manpower in constructing a beam coupling structure.SOLUTION: A construction method of a beam coupling structure includes: a column installation step of erecting a column member 10; and a beam installation step of lowering a beam member 20 having a penetration part 21 from above the column member 10 and installing the beam member 20 around the column member 10. Further, the beam installation step includes: a first beam installation step of installing an X-direction beam member 22; a removal step of removing a coupling part 24 from the X-direction beam member 22; a second beam installation step of installing a Y-direction beam member 23; and an attachment step of attaching the coupling part 24 to a first reinforcement unit 22a and a second reinforcement unit 22b.SELECTED DRAWING: Figure 1
【課題】梁連結構造を構築する際の工期短縮および省人化を図る。【解決手段】柱部材10を立設する柱設置工程と、貫通部21を備えた梁部材20を、柱部材10の上方から下降させて、柱部材10の周囲に梁部材20を設置する梁設置工程とを備えることを特徴とする。さらに、梁設置工程は、X方向梁部材22を設置する第一梁設置工程と、X方向梁部材22から連結部24を取り外す取外工程と、Y方向梁部材23を設置する第二梁設置工程と、連結部24を第一鉄筋ユニット22aと第二鉄筋ユニット22bとに取り付ける取付工程とを備えている。【選択図】図1
CONSTRUCTION METHOD OF BEAM COUPLING STRUCTURE, AND BEAM MEMBER
PROBLEM TO BE SOLVED: To shorten a construction period and save manpower in constructing a beam coupling structure.SOLUTION: A construction method of a beam coupling structure includes: a column installation step of erecting a column member 10; and a beam installation step of lowering a beam member 20 having a penetration part 21 from above the column member 10 and installing the beam member 20 around the column member 10. Further, the beam installation step includes: a first beam installation step of installing an X-direction beam member 22; a removal step of removing a coupling part 24 from the X-direction beam member 22; a second beam installation step of installing a Y-direction beam member 23; and an attachment step of attaching the coupling part 24 to a first reinforcement unit 22a and a second reinforcement unit 22b.SELECTED DRAWING: Figure 1
【課題】梁連結構造を構築する際の工期短縮および省人化を図る。【解決手段】柱部材10を立設する柱設置工程と、貫通部21を備えた梁部材20を、柱部材10の上方から下降させて、柱部材10の周囲に梁部材20を設置する梁設置工程とを備えることを特徴とする。さらに、梁設置工程は、X方向梁部材22を設置する第一梁設置工程と、X方向梁部材22から連結部24を取り外す取外工程と、Y方向梁部材23を設置する第二梁設置工程と、連結部24を第一鉄筋ユニット22aと第二鉄筋ユニット22bとに取り付ける取付工程とを備えている。【選択図】図1
CONSTRUCTION METHOD OF BEAM COUPLING STRUCTURE, AND BEAM MEMBER
梁連結構造の構築方法および梁部材
KITAMURA KIMINAO (Autor:in) / ISAKA TAKANORI (Autor:in)
01.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Coupling Beam Reinforcement Structure Using Angle Member
Europäisches Patentamt | 2017
Europäisches Patentamt | 2016
BEAM CONSTRUCTION METHOD, BEAM, AND HALF-PRECAST MEMBER
Europäisches Patentamt | 2024
|Coupling Beam Reinforcement Structure Using Angle Member
Europäisches Patentamt | 2016
|