PROBLEM TO BE SOLVED: To construct free-gradient drainage facilities by post-casting adjustment concrete in a U-shaped side ditch.SOLUTION: Juxtaposed horizontal slits are provided on an inner bottom of a U-shaped side ditch. An undersurface of post-cast adjustment concrete is restrained by an embedment anchor in the horizontal slit to stabilize and improve adhesion.SELECTED DRAWING: Figure 1
【課題】 U形側溝に調整コンクリートをあと打ちして自由勾配排水施設を構築する。【解決手段】 U形側溝の内底部に並列する横スリットを設け、あと打ち調整コンクリートの下面が横スリット内根入アンカーによって拘束付着を安定向上させる。【選択図】図1
PROBLEM TO BE SOLVED: To construct free-gradient drainage facilities by post-casting adjustment concrete in a U-shaped side ditch.SOLUTION: Juxtaposed horizontal slits are provided on an inner bottom of a U-shaped side ditch. An undersurface of post-cast adjustment concrete is restrained by an embedment anchor in the horizontal slit to stabilize and improve adhesion.SELECTED DRAWING: Figure 1
【課題】 U形側溝に調整コンクリートをあと打ちして自由勾配排水施設を構築する。【解決手段】 U形側溝の内底部に並列する横スリットを設け、あと打ち調整コンクリートの下面が横スリット内根入アンカーによって拘束付着を安定向上させる。【選択図】図1
FREE-GRADIENT U-SHAPED SIDE DITCH
自由勾配U形側溝
OSHIMA MASATAKE (Autor:in)
01.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
CONSTRUCTION METHOD OF VARIABLE-GRADIENT SIDE DITCH, AND SIDE DITCH CONSTRUCTION BLOCK