Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STEEL PLATE CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To provide a steel plate concrete structure capable of ensuring desired rigidity and effectively improving bearing force.SOLUTION: A steel plate concrete structure A is made by charging a concrete 4 between one main steel plate 1 and the other main steel plate 2 that is disposed with a predetermined distance from one main steel plate 1. A vertical rib steel plate 7 through which an opening 7a is penetrated is installed by integrally connecting to the one main steel plate 1 and the other main steel plate 2. A shear reinforcement 8 is provided by being inserted in the opening 7a at one end and the other end to thereby connect the one rib steel plate 7 that is connected to one main steel plate 1 and connecting the other rib steel plate 7 that is connected to the other main steel plate 2.SELECTED DRAWING: Figure 2
【課題】所望の剛性を確保しつつ効果的に耐力を向上させることを可能にした鋼板コンクリート構造を提供する。【解決手段】一方の主鋼板1と、一方の主鋼板1と所定の間隔をあけて配設された他方の主鋼板2との間にコンクリート4を充填してなる鋼板コンクリート構造Aにおいて、一方の主鋼板1と、他方の主鋼板2にそれぞれ、開口7aが貫通形成されたリブ鋼板7を一体に接続して設け、且つ、開口7aに挿通しつつ、一方の主鋼板1に接続した一方のリブ鋼板7と、他方の主鋼板2に接続した他方のリブ鋼板7とにそれぞれ一端部側と他端部側を接続してせん断補強筋8を設けて構成する。【選択図】図2
STEEL PLATE CONCRETE STRUCTURE
PROBLEM TO BE SOLVED: To provide a steel plate concrete structure capable of ensuring desired rigidity and effectively improving bearing force.SOLUTION: A steel plate concrete structure A is made by charging a concrete 4 between one main steel plate 1 and the other main steel plate 2 that is disposed with a predetermined distance from one main steel plate 1. A vertical rib steel plate 7 through which an opening 7a is penetrated is installed by integrally connecting to the one main steel plate 1 and the other main steel plate 2. A shear reinforcement 8 is provided by being inserted in the opening 7a at one end and the other end to thereby connect the one rib steel plate 7 that is connected to one main steel plate 1 and connecting the other rib steel plate 7 that is connected to the other main steel plate 2.SELECTED DRAWING: Figure 2
【課題】所望の剛性を確保しつつ効果的に耐力を向上させることを可能にした鋼板コンクリート構造を提供する。【解決手段】一方の主鋼板1と、一方の主鋼板1と所定の間隔をあけて配設された他方の主鋼板2との間にコンクリート4を充填してなる鋼板コンクリート構造Aにおいて、一方の主鋼板1と、他方の主鋼板2にそれぞれ、開口7aが貫通形成されたリブ鋼板7を一体に接続して設け、且つ、開口7aに挿通しつつ、一方の主鋼板1に接続した一方のリブ鋼板7と、他方の主鋼板2に接続した他方のリブ鋼板7とにそれぞれ一端部側と他端部側を接続してせん断補強筋8を設けて構成する。【選択図】図2
STEEL PLATE CONCRETE STRUCTURE
鋼板コンクリート構造
OTA KAZUYA (Autor:in) / JINNO YASUO (Autor:in) / HIRAMA TOSHIHIKO (Autor:in) / TAMURA TADASHI (Autor:in) / MORIIZUMI ERIKO (Autor:in)
08.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
STEEL PLATE CONCRETE STRUCTURE AND CONSTRUCTION METHOD FOR STEEL PLATE CONCRETE STRUCTURE
Europäisches Patentamt | 2018
|