GROUND IMPROVEMENT CONSTRUCTION MACHINE
PROBLEM TO BE SOLVED: To securely resolve attachment of an improvement material in a bucket or a hopper even when a material hard to be handled as the improvement material is used, so as to maintain work efficiency excellently and to prevent an adverse effect on monitoring equipment and others installed on the periphery.SOLUTION: A ground improvement construction machine comprises: a transport bucket 3 which is lifted and lowered along a leader 2; and a hollow tube 5 which has a hopper 4 at the upper part to which an improvement material such as sand accommodated in the bucket 3 is inputted, and is capable of being lifted and lowered along the leader 2 and penetrated in and pulled out from the ground. The bucket 3 and the hopper 4 have inclined planes 31 and 41 on side walls 30 and 40 partitioning the inside as well as an input port on the upper side and an exhaust port on the lower side. An improvement material inputted inside is transported from the inclined planes to the exhaust ports 3b and 4b. The bucket 3 and/or the hopper 4 is provided with a vibrating plate 7 arranged to cover the inclined plane or a part of the inclined plane and supported so as to be oscillatory and displaceable through a plurality of elastic bodies 6.SELECTED DRAWING: Figure 6
【課題】バケットやホッパーにおいて、改良材として扱い難い材料を用いても付着の虞を確実に解消でき、それにより作業効率を良好に維持でき、また周辺に設けられている監視機器等に悪影響を及ぼさないようにする。【解決手段】リーダー2に沿って昇降される運搬用バケット3と、バケット3に収容された砂類等の改良材を投入するホッパー4を上部に有しリーダー2に沿って昇降可能で地中に貫入されたり引き抜かれる中空管5とを備え、バケット3及びホッパー4は上側の投入口及び下側の排出口と共に、内部を区画している側壁30,40に傾斜面31,41を有し、内部に投入された改良材を前記傾斜面上から前記排出口3b,4bへ移動する地盤改良施工機であって、バケット3又は/及びホッパー4は、前記傾斜面又は傾斜面の一部を覆うよう配置されると共に、複数の弾性体6を介して揺動変位自在に支持されている振動板7を有していることを特徴としている。【選択図】図6
GROUND IMPROVEMENT CONSTRUCTION MACHINE
PROBLEM TO BE SOLVED: To securely resolve attachment of an improvement material in a bucket or a hopper even when a material hard to be handled as the improvement material is used, so as to maintain work efficiency excellently and to prevent an adverse effect on monitoring equipment and others installed on the periphery.SOLUTION: A ground improvement construction machine comprises: a transport bucket 3 which is lifted and lowered along a leader 2; and a hollow tube 5 which has a hopper 4 at the upper part to which an improvement material such as sand accommodated in the bucket 3 is inputted, and is capable of being lifted and lowered along the leader 2 and penetrated in and pulled out from the ground. The bucket 3 and the hopper 4 have inclined planes 31 and 41 on side walls 30 and 40 partitioning the inside as well as an input port on the upper side and an exhaust port on the lower side. An improvement material inputted inside is transported from the inclined planes to the exhaust ports 3b and 4b. The bucket 3 and/or the hopper 4 is provided with a vibrating plate 7 arranged to cover the inclined plane or a part of the inclined plane and supported so as to be oscillatory and displaceable through a plurality of elastic bodies 6.SELECTED DRAWING: Figure 6
【課題】バケットやホッパーにおいて、改良材として扱い難い材料を用いても付着の虞を確実に解消でき、それにより作業効率を良好に維持でき、また周辺に設けられている監視機器等に悪影響を及ぼさないようにする。【解決手段】リーダー2に沿って昇降される運搬用バケット3と、バケット3に収容された砂類等の改良材を投入するホッパー4を上部に有しリーダー2に沿って昇降可能で地中に貫入されたり引き抜かれる中空管5とを備え、バケット3及びホッパー4は上側の投入口及び下側の排出口と共に、内部を区画している側壁30,40に傾斜面31,41を有し、内部に投入された改良材を前記傾斜面上から前記排出口3b,4bへ移動する地盤改良施工機であって、バケット3又は/及びホッパー4は、前記傾斜面又は傾斜面の一部を覆うよう配置されると共に、複数の弾性体6を介して揺動変位自在に支持されている振動板7を有していることを特徴としている。【選択図】図6
GROUND IMPROVEMENT CONSTRUCTION MACHINE
地盤改良施工機
YABE HIROSHI (Autor:in) / ISOTANI SHUJI (Autor:in)
15.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B65D
Behältnisse zur Lagerung oder zum Transport von Gegenständen oder Materialien [Container], z.B. Säcke, Beutel, Fässer, Flaschen, Dosen, Kästen, Büchsen, Schachteln, Packkörbe, Tonnen, Gläser, Flüssigkeitsbehälter, Trichtersilos, Transportbehälter
,
CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS
SLOPED GROUND IMPROVEMENT CONSTRUCTION MACHINE AND SLOPED GROUND IMPROVEMENT METHOD USING THE SAME