BRIDGE FALL PREVENTION STRUCTURE
PROBLEM TO BE SOLVED: To provide a bridge fall prevention structure for preventing a fall of a bridge girder, and capable of reducing maintenance work after an earthquake.SOLUTION: When a bridge girder 20 forces up along an inclined plane 31 of a bridge girder restoration member 30 by slidably moving in the crossing direction with its extension direction by an earthquake, restoration force for returning the positional relationship between the bridge girder 20 and a support structure 10 to an original state, is generated by pulling down its bridge girder 20 along the inclined plane 31 so as not to excessively slidably move the bridge girder 20, and prevents a bridge fall from above the support structure 10. After settling the earthquake, the bridge girder 20 forced up along the inclined plane is restored to predetermined arrangement by sliding down along the inclined plane by its restoring force. That is, since this bridge fall prevention structure 100 can restore the bridge girder 20 to the predetermined arrangement on the support structure 10, restoration work such as returning the dislocated bridge girder 20 to a predetermined position is obviated, so that maintenance work after the earthquake can be reduced.SELECTED DRAWING: Figure 2
【課題】橋桁の落下を防止するとともに、地震後のメンテナンス作業を軽減することができる落橋防止構造を提供する。【解決手段】地震によって橋桁20がその延在方向と交差する方向にスライド移動し、橋桁復元部材30の傾斜面31に沿って迫り上がると、その橋桁20を傾斜面31に沿って引き下ろして橋桁20と支持構造物10との位置関係を元に戻す復元力が生じ、橋桁20がスライド移動し過ぎないようになっており、支持構造物10上から落橋するのを防いでいる。また、地震が治まった後、傾斜面に沿って迫り上がった橋桁20はその復元力によって傾斜面に沿って滑り下り所定の配置に復元する。つまり、この落橋防止構造100であれば、地震が治まった後、橋桁20を支持構造物10上での所定の配置に復元させることができるので、ずれた橋桁20を所定位置に戻すような復旧工事が不要になり、地震後のメンテナンス作業を軽減することができる。【選択図】図2
BRIDGE FALL PREVENTION STRUCTURE
PROBLEM TO BE SOLVED: To provide a bridge fall prevention structure for preventing a fall of a bridge girder, and capable of reducing maintenance work after an earthquake.SOLUTION: When a bridge girder 20 forces up along an inclined plane 31 of a bridge girder restoration member 30 by slidably moving in the crossing direction with its extension direction by an earthquake, restoration force for returning the positional relationship between the bridge girder 20 and a support structure 10 to an original state, is generated by pulling down its bridge girder 20 along the inclined plane 31 so as not to excessively slidably move the bridge girder 20, and prevents a bridge fall from above the support structure 10. After settling the earthquake, the bridge girder 20 forced up along the inclined plane is restored to predetermined arrangement by sliding down along the inclined plane by its restoring force. That is, since this bridge fall prevention structure 100 can restore the bridge girder 20 to the predetermined arrangement on the support structure 10, restoration work such as returning the dislocated bridge girder 20 to a predetermined position is obviated, so that maintenance work after the earthquake can be reduced.SELECTED DRAWING: Figure 2
【課題】橋桁の落下を防止するとともに、地震後のメンテナンス作業を軽減することができる落橋防止構造を提供する。【解決手段】地震によって橋桁20がその延在方向と交差する方向にスライド移動し、橋桁復元部材30の傾斜面31に沿って迫り上がると、その橋桁20を傾斜面31に沿って引き下ろして橋桁20と支持構造物10との位置関係を元に戻す復元力が生じ、橋桁20がスライド移動し過ぎないようになっており、支持構造物10上から落橋するのを防いでいる。また、地震が治まった後、傾斜面に沿って迫り上がった橋桁20はその復元力によって傾斜面に沿って滑り下り所定の配置に復元する。つまり、この落橋防止構造100であれば、地震が治まった後、橋桁20を支持構造物10上での所定の配置に復元させることができるので、ずれた橋桁20を所定位置に戻すような復旧工事が不要になり、地震後のメンテナンス作業を軽減することができる。【選択図】図2
BRIDGE FALL PREVENTION STRUCTURE
落橋防止構造
KOBAYASHI KAORU (Autor:in) / HIRABAYASHI MASAYA (Autor:in)
22.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
BRIDGE FALL PREVENTION STRUCTURE FOR MASONRY BRIDGE PIER