INSTALLATION METHOD OF EARTH ANCHOR
PROBLEM TO BE SOLVED: To provide an installation method of an earth anchor, easy in adjusting a process, capable of reducing construction cost, and excellent in workability and safety.SOLUTION: An earth retaining wall 3 is installed in a ground 1, and an anchor hole 11 is drilled in the oblique direction so as to penetrate through the earth retaining wall 3 from the ground 1 on an excavation side 33 above an anchor penetration hole 4 of the earth retaining wall 3. Next, an anchor steel material 7 is inserted into the anchor hole 11, and a grout material 13 is injected. Afterwards, the grout material 13 is further pressurized-injected, an anchor body 31 is formed, and a casing 23 is extracted. The ground 1 on the excavation side 33 is excavated up to a predetermined depth, an excavation side surface of the earth retaining wall 3 is exposed, a bracket 15 is welded, and a wale 17 is installed in the bracket 15. An anchorage member 19 is also installed in the wale 17, the anchor body 31 is hardened, the anchor steel material 7 is then tensioned, a head part is anchored to the anchorage member 19 by using an anchorage device 21, and an earth anchor 14 at a first stage is completed.SELECTED DRAWING: Figure 3
【課題】工程調整が容易であり、工費を削減でき、施工性や安全性に優れたアースアンカーの打設方法を提供する。【解決手段】地盤1に山留壁3を打設し、山留壁3のアンカー貫通孔4よりも上方の掘削側33の地盤1から、山留壁3を貫通するように斜め方向にアンカー孔11を削孔する。次に、アンカー孔11にアンカー鋼材7を挿入し、グラウト材13を注入する。その後、グラウト材13をさらに加圧注入してアンカー体31を形成してケーシング23を引き抜く。そして、掘削側33の地盤1を所定の深さまで掘削し、山留壁3の掘削側の面を露出させてブラケット15を溶接し、ブラケット15に腹起こし17を設置する。さらに、腹起こし17に定着部材19を取り付け、アンカー体31の硬化後、アンカー鋼材7を緊張して頭部を定着具21を用いて定着部材19に定着して、1段目のアースアンカー14を完成する。【選択図】図3
INSTALLATION METHOD OF EARTH ANCHOR
PROBLEM TO BE SOLVED: To provide an installation method of an earth anchor, easy in adjusting a process, capable of reducing construction cost, and excellent in workability and safety.SOLUTION: An earth retaining wall 3 is installed in a ground 1, and an anchor hole 11 is drilled in the oblique direction so as to penetrate through the earth retaining wall 3 from the ground 1 on an excavation side 33 above an anchor penetration hole 4 of the earth retaining wall 3. Next, an anchor steel material 7 is inserted into the anchor hole 11, and a grout material 13 is injected. Afterwards, the grout material 13 is further pressurized-injected, an anchor body 31 is formed, and a casing 23 is extracted. The ground 1 on the excavation side 33 is excavated up to a predetermined depth, an excavation side surface of the earth retaining wall 3 is exposed, a bracket 15 is welded, and a wale 17 is installed in the bracket 15. An anchorage member 19 is also installed in the wale 17, the anchor body 31 is hardened, the anchor steel material 7 is then tensioned, a head part is anchored to the anchorage member 19 by using an anchorage device 21, and an earth anchor 14 at a first stage is completed.SELECTED DRAWING: Figure 3
【課題】工程調整が容易であり、工費を削減でき、施工性や安全性に優れたアースアンカーの打設方法を提供する。【解決手段】地盤1に山留壁3を打設し、山留壁3のアンカー貫通孔4よりも上方の掘削側33の地盤1から、山留壁3を貫通するように斜め方向にアンカー孔11を削孔する。次に、アンカー孔11にアンカー鋼材7を挿入し、グラウト材13を注入する。その後、グラウト材13をさらに加圧注入してアンカー体31を形成してケーシング23を引き抜く。そして、掘削側33の地盤1を所定の深さまで掘削し、山留壁3の掘削側の面を露出させてブラケット15を溶接し、ブラケット15に腹起こし17を設置する。さらに、腹起こし17に定着部材19を取り付け、アンカー体31の硬化後、アンカー鋼材7を緊張して頭部を定着具21を用いて定着部材19に定着して、1段目のアースアンカー14を完成する。【選択図】図3
INSTALLATION METHOD OF EARTH ANCHOR
アースアンカーの打設方法
NEMOTO YOSHIAKI (Autor:in) / NISHIO AKIRA (Autor:in)
22.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,