LIFTING TOOL FOR STEEL PIPE PILE CONNECTION CAP
PROBLEM TO BE SOLVED: To provide a lifting tool for a steel pipe pile connection cap that enables a steel pipe pile connection cap to be lifted safely in a standing state.SOLUTION: A lifting tool 20 for a steel pipe pile connection cap includes: a top plate 21 mounted on a top end of a connection shaft 10b of a steel pipe pile connection cap 10; a cover part 22 formed integrally with the top plate 21, for covering a side surface of the connection shaft 10b; a hanging and holding piece 23 protruding upward from the top plate 21; and a boss part 24 protruding downward from the top plate 21, to be inserted into an open hole 10c formed on the connection shaft 10b. A pin insertion hole 22c is formed in the cover part 22, at a location corresponding to a joint pin engaging groove 10e formed on the side surface of the connection shaft 10b.SELECTED DRAWING: Figure 1
【課題】 鋼管杭連結用キャップを立てた状態で安全に吊り上げることができる鋼管杭連結キャップ用吊り具を提供する。【解決手段】 鋼管杭連結キャップ用吊り具20は、鋼管杭連結キャップ10の連結軸10bの上端に載置される天板21と、該天板21と一体に形成され、連結軸10bの側面をカバーするカバー部22と、天板21より上方に突出する吊持片23と、天板21より下方に突出し、連結軸10bに設けられた貫通孔10cに挿入されるボス部24とを備え、カバー部22には、連結軸10bの側面に設けられたジョイントピン係合溝10eに対応する位置にピン挿通孔22cを設けている。【選択図】 図1
LIFTING TOOL FOR STEEL PIPE PILE CONNECTION CAP
PROBLEM TO BE SOLVED: To provide a lifting tool for a steel pipe pile connection cap that enables a steel pipe pile connection cap to be lifted safely in a standing state.SOLUTION: A lifting tool 20 for a steel pipe pile connection cap includes: a top plate 21 mounted on a top end of a connection shaft 10b of a steel pipe pile connection cap 10; a cover part 22 formed integrally with the top plate 21, for covering a side surface of the connection shaft 10b; a hanging and holding piece 23 protruding upward from the top plate 21; and a boss part 24 protruding downward from the top plate 21, to be inserted into an open hole 10c formed on the connection shaft 10b. A pin insertion hole 22c is formed in the cover part 22, at a location corresponding to a joint pin engaging groove 10e formed on the side surface of the connection shaft 10b.SELECTED DRAWING: Figure 1
【課題】 鋼管杭連結用キャップを立てた状態で安全に吊り上げることができる鋼管杭連結キャップ用吊り具を提供する。【解決手段】 鋼管杭連結キャップ用吊り具20は、鋼管杭連結キャップ10の連結軸10bの上端に載置される天板21と、該天板21と一体に形成され、連結軸10bの側面をカバーするカバー部22と、天板21より上方に突出する吊持片23と、天板21より下方に突出し、連結軸10bに設けられた貫通孔10cに挿入されるボス部24とを備え、カバー部22には、連結軸10bの側面に設けられたジョイントピン係合溝10eに対応する位置にピン挿通孔22cを設けている。【選択図】 図1
LIFTING TOOL FOR STEEL PIPE PILE CONNECTION CAP
鋼管杭連結キャップ用吊り具
WATANABE SACHIHIRO (Autor:in)
22.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE CONNECTION METHOD
Europäisches Patentamt | 2022
|STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE BASE, AND CONNECTION METHOD OF STEEL PIPE PILE
Europäisches Patentamt | 2023
|PIPE PILE LIFTING DEVICE AND PIPE PILE LIFTING METHOD