Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a method of burying a pile that prevents the pile from wobbling relatively pliers when burying the pile with the pliers connected to a pile head of the pile.SOLUTION: A jack 13 consisting of a fixed part 13a, a movable part 13b and a hydraulic cylinder 13c is built in a steel pipe 11 to serve as pliers 10. When the pliers 10 are connected to a pile 20, the hydraulic cylinder 13c of the jack 13 is extended to bring the movable part 13b into contact with an upper surface of a pile head 21 of a pile 20. The hydraulic cylinder 13c is further extended and then the fixed part 13a of the jack 13 and the steel pipe 11 fixed thereto are pushed up by a reaction from the pile head 21. Consequently, a projection 22 of the pile 20 introduced into a lateral groove 12b of a cut 12 of the steel pipe 11 is pressed forcibly against a groove edge of the lateral groove 12b, thereby eliminating a clearance between the cut 12 and projection 22. The pliers 10 and pile 20 are tightly connected together without wobbling.SELECTED DRAWING: Figure 1
【課題】ヤットコを杭の杭頭に接続した状態で埋設する際に、杭がヤットコに対してぐらつくことを防止した杭の埋設方法を提供する。【解決手段】ヤットコ10となる鋼管11に固定部13a、可動部13b、油圧シリンダ13cからなるジャッキ13を内蔵させる。ヤットコ10を杭20に接続させる際には、このジャッキ13の油圧シリンダ13cを伸長させて可動部13bを杭20の杭頭21の上面に密着させ、さらに油圧シリンダ13cを伸長させると杭頭21からの反作用によりジャッキ13の固定部13aとこれに固定された鋼管11は押し上げられる。これにより、鋼管11の切欠き12の横溝12bに導入された杭20の突起22は、横溝12bの溝縁へと強制的に押し付けられるため、切欠き12と突起22の間の遊びがなくなり、ヤットコ10と杭20はぐらつかないようにしっかりと接続される。【選択図】図1
PROBLEM TO BE SOLVED: To provide a method of burying a pile that prevents the pile from wobbling relatively pliers when burying the pile with the pliers connected to a pile head of the pile.SOLUTION: A jack 13 consisting of a fixed part 13a, a movable part 13b and a hydraulic cylinder 13c is built in a steel pipe 11 to serve as pliers 10. When the pliers 10 are connected to a pile 20, the hydraulic cylinder 13c of the jack 13 is extended to bring the movable part 13b into contact with an upper surface of a pile head 21 of a pile 20. The hydraulic cylinder 13c is further extended and then the fixed part 13a of the jack 13 and the steel pipe 11 fixed thereto are pushed up by a reaction from the pile head 21. Consequently, a projection 22 of the pile 20 introduced into a lateral groove 12b of a cut 12 of the steel pipe 11 is pressed forcibly against a groove edge of the lateral groove 12b, thereby eliminating a clearance between the cut 12 and projection 22. The pliers 10 and pile 20 are tightly connected together without wobbling.SELECTED DRAWING: Figure 1
【課題】ヤットコを杭の杭頭に接続した状態で埋設する際に、杭がヤットコに対してぐらつくことを防止した杭の埋設方法を提供する。【解決手段】ヤットコ10となる鋼管11に固定部13a、可動部13b、油圧シリンダ13cからなるジャッキ13を内蔵させる。ヤットコ10を杭20に接続させる際には、このジャッキ13の油圧シリンダ13cを伸長させて可動部13bを杭20の杭頭21の上面に密着させ、さらに油圧シリンダ13cを伸長させると杭頭21からの反作用によりジャッキ13の固定部13aとこれに固定された鋼管11は押し上げられる。これにより、鋼管11の切欠き12の横溝12bに導入された杭20の突起22は、横溝12bの溝縁へと強制的に押し付けられるため、切欠き12と突起22の間の遊びがなくなり、ヤットコ10と杭20はぐらつかないようにしっかりと接続される。【選択図】図1
METHOD OF BURYING PILE
杭の埋設方法
ENOKI HIROSHI (Autor:in)
05.01.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen